Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: A problem that needs to be fixed |
Tags: | bridge, late, m8motorway, newbuild, replacement, unfinished |
Date time: | 2.32pm, Saturday 8th April, 2017 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
The replacement Bredisholm Road farm road access bridge across the A8 and M8 motorway was originally meant to be ready to reopen in July 2016, but looks like there is still quite a bit of work to do if it is to meet the revised target of May 2017. Bredisholm Road provides a useful route around the Baillieston Interchange motorway junction, between Bargeddie and Bracadale Gardens.
Comments reflect the views of the original submitter only.