Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | footpathclosed, minibus, raithinterchange, shuttle, shuttlebus |
Date time: | 2.00pm, Wednesday 3rd May, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
Since the old footway around the Raith Interchange has been dug up, and the new footway (including the two new footbridges) is not finished, there is currently (May 2017) a free shuttle bus connection. It picks up here near the entrance to Strathclyde Park, and on the loop road off of the main dual carriageway on the Bothwell side of the Raith Interchange, and has room for a bike (maybe two) in a compartment at the rear of the minibus.
Comments reflect the views of the original submitter only.