Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | crossing, end, linesegregation, ravenscraig, roundabout, slow |
Date time: | 12.41pm, Wednesday 3rd May, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
End of the line-segregated cycleway through Ravenscraig. Why doesn't it continue through to Craigneuk St?
Comments reflect the views of the original submitter only.