Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | junction, kelvin, kelvincycleway, kelvinwalkway, mud, path |
Date time: | 4.28pm, Friday 9th June, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Welcome as these improved paths are, they've caused problems on the main Kelvin Walkway, including mud washing down the hill.
Comments reflect the views of the original submitter only.