Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a725, corner, crossing, new, raithinterchange, shareduse, toucan |
Date time: | 3.09pm, Sunday 3rd September, 2017 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
The end of the ramp from the Raith Interchange roundabout cycle bridge (see #93301) ends at the A725 sliproad. There are then some right-angled corners to turn at and toucan crossings to cross to get to Bothwell.
Queuing drivers also seem extremely willing to stop on the crossing, repeatedly blocking it. No enforcement noted.
Comments reflect the views of the original submitter only.