Category: | Cycleway: A problem that needs to be fixed |
Tags: | eddington, ridgeway, surface, tarspraychip |
Date time: | 3.26pm, Friday 28th July, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | mdanish |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Unopened section of Ridgeway with weirdly shaped bollards & loose gravel pathway (supposed to be swept clean eventually).
Comments reflect the views of the original submitter only.