Category: | Cycleway: A problem that needs to be fixed |
Tags: | cockup, eddington |
Date time: | 3.30pm, Friday 28th July, 2017 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | mdanish |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The contractor disobeyed instructions and painted give-way markings on what was supposed to be a priority cycleway. We don't know when it will be fixed.
Comments reflect the views of the original submitter only.