Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bridge, destination, fence, keepout, late, m8a8, m8motorway, newbuild, newroadlayout, nothroughroad, replacement, roadworks, sign, unfinished |
Date time: | 5.07pm, Sunday 3rd September, 2017 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
The new bridge over the A8 and M8 for Bredisholm Road is still not quite ready!
Note that the sign on the left says it's a No Through Road, but the sign on the right gives destinations reachable via this road. Highly illogical! But no mention of Baillieston, when this is where you'd get if you followed the route straight through.
Comments reflect the views of the original submitter only.