Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | glasgowcycleinfraday17, twitterimport |
Date time: | 5.16pm, Friday 8th September, 2017 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | cycleinfraday |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/magnatom/status/906189539030556674 |
Credit: | David Brennan [Twitter username: 'magnatom'] |
Area: | Glasgow |
This useful piece of infra (Balshagray Ave) is always thick with mud. Oh and overhanging trees. More cyclocross. #GlasgowCycleInfraDay17 t.co/AY8ltNssRA
Comments reflect the views of the original submitter only.