Category: | General road environment: A problem that needs to be fixed |
Tags: | glasgowcycleinfraday17, twitterimport |
Date time: | 8.15pm, Friday 8th September, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | cycleinfraday |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/CycleInfraDay/status/906234463117611011 |
Credit: | GlasgowCycleInfraDay [Twitter username: 'CycleInfraDay'] |
Area: | Glasgow |
[via email] Gate to Festival Park. Fastlink construction removed the dropped kerb, replaced with 3 undropped kerbs #GlasgowCycleInfraDay17 t.co/OMViXRkBbX
Comments reflect the views of the original submitter only.