Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | agm, ceogb, discussion, infrastructuresafari, underpass |
Date time: | 5.29pm, Saturday 16th September, 2017 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Underpass discussion at a CEoGB AGM infrastructure safari.
Comments reflect the views of the original submitter only.