Category: | Cycleway: Event or temporary issue |
Tags: | cambridge, eddington |
Date time: | 6.48pm, Wednesday 27th September, 2017 |
Time line: | Earlier | Later |
Facing: | Bearing of 339° |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
There are still lots of hoardings up along and across the shared-use paths around the Eddington site
Comments reflect the views of the original submitter only.