Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cambridge, regentterrace |
Date time: | 9.48am, Sunday 19th November, 2017 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Decent temporary cycle path (and fence) put in at last, after the developers tried to get away with doing nothing. The damage done is visible to the right.
Comments reflect the views of the original submitter only.