Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | bridge, glasgowharbour, paving, settlement |
Date time: | 2.21pm, Sunday 3rd December, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Settlement at the south end of the flagship active travel bridge across the Clydeside Expressway at the Glasgow Harbour development.
Comments reflect the views of the original submitter only.