Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | closure, construction, park, path |
Date time: | 12.01pm, Thursday 28th December, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The path beyond the fence in #95371 has already been built, but isn't being maintained since it is within a construction site.
Comments reflect the views of the original submitter only.