Category: | General road environment: A problem that needs to be fixed |
Tags: | bollocks, crossing, hillsroad, staggered, walking |
Date time: | 8.42am, Monday 29th January, 2018 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | mdanish |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Newly constructed Cross City Cycling scheme but the '2.2 metre wide' refuge is considerably narrowed by the poor placement of poles. And seems to be a trash collection point as well (probably due to the wind).
Comments reflect the views of the original submitter only.