Category: | A hole in the ground to avoid.: A problem that needs to be fixed |
Tags: | crumblingcambridge, hillsroad |
Date time: | 6.08pm, Saturday 3rd March, 2018 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
I'd heard the new surface on Hills Road was falling apart, but didn't think it would be so bad.
Comments reflect the views of the original submitter only.