Category: | Cycleway: An example of good practice |
Tags: | bollards, cambridge, carterbridge, nomotorvehicles, ramp |
Date time: | 9.46am, Friday 13th April, 2018 |
Time line: | Earlier | Later |
Facing: | Bearing of 119° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Final bollard arrangement where the new ramp on the left connects with the Carter Bridge ramp.
Comments reflect the views of the original submitter only.