Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Other (infrastructure-related) |
Tags: | cathkinbraesroute, crossing, junction, oatlands, shareduse, toucan, trafficsignals |
Date time: | 2.16pm, Saturday 21st April, 2018 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
When the Polmadie Bridge is rebuilt, the route to Glasgow Green will be straight ahead, across the split toucan crossing and down the ramp to Old Polmadie Road.
Comments reflect the views of the original submitter only.