Category: | General road environment: Other (infrastructure-related) |
Tags: | busway, clydewalkway, fastlink, footway, ncn75 |
Date time: | 1.35pm, Tuesday 22nd May, 2018 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The shared use sign (see #65297) for the Broomielaw footway has been removed and signs now direct cyclists to the Clyde Walkway. But old habits die hard.
Comments reflect the views of the original submitter only.