Category: | Cycleway: Other (infrastructure-related) |
Tags: | bollard, lochlomondpath, ncn7 |
Date time: | 2.45pm, Friday 25th May, 2018 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A plastic bollard has replaced the previous metal barriers in the path.
Comments reflect the views of the original submitter only.