Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | giveway, junction, m8a8, sign |
Date time: | 1.25pm, Monday 28th May, 2018 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
Why is the route sign so far away from the junction?
Comments reflect the views of the original submitter only.