'You are being diverted today for a new route tomorrow' - sign about the construction of the new bridge, Namur
Dunham Massey Footbridge crossing from Trafford to East Cheshire see also #83857 and #104220 . On a busy day this bridge has large queues as only one direction at a time is possible. This crossing is not fit for purpose and will not allow ... [more]
Narrow towpath under bridge of A619 and Tapton Lock Hill - towpath is liable to flooding (infrastructure cannot be altered to alleviate)
Narrow towpath under A619 and Tapton Lock Hill - path is liable to flooding (infrastructure cannot be altered to alleviate)
Brimington Wharf Bridge Southbound just after the divergence of the TPT onto road and from the convergence with the towpath and recommended cycle path.
Brimington Wharf Bridge Northbound. Note that there is a path to the left of the low wall that technically is the TPT but the egress at the top of the steep path is barred by a gate with a very narrow gap between the fence and wall - ok for ... [more]
The temporary footbridge on #MillRoad in 1980…@MillRoadBridges @MillRoadHistory @camcycle @CambridgeLabour https://t.co/3exMcDULaL https://capturingcambridge.org/wp-content/uploads/2018/04/Bridge-report-1st_edition-2018-04.pdf https ... [more]
Woodgate Valley Country Park - footbridge on the Bourn Brook Location: , Birmingham City (England, United Kingdom) Footbridge on the Bourn Brook
The ramped, stepped bridge between Grantchester and Haslingfield. The lack of legitimate cycle routes connecting these two villages is a disgrace. Location: England, United Kingdom Grantchester, Cambridge
Randall's Island Bridge where you're told that bicycles must be walked over the bridge: For your safety, and the safety of others, bicycles must be walked across the bridge. Use of cameras on bridge prohibited and strictly enforc ... [more]
'No Motor Vehicles' over the rebuilt railway bridge at Hallglen, although they'd either have to fit through the underpass at #103230 or come down some steps!
A new bridge over the Westquarter Burn for access to a new housing development. Imagine if that sort of money had been spent on the path!
A sign for the HArTT cycle route pointing towards Spinkhill (see #103160), but as the old railway bridge was removed (see #103161), a hair-pin bend path has been built up to New Hallglen Road to use its bridge instead. No indications whethe ... [more]
A track that used to lead to a bridge that the HArTT cycle route used to cross the railway line. However, the bridge has been removed, leaving only the New Hallglen Road bridge to cross by. The HArTT cycle route sign at #103163 can be se ... [more]
Kilkenny bridge The stones on the right read: The Right Honorable Earl of Desart Mayor 1810 and below: The above stone was taken from the old and placed on the new St. John's Bridge Designed in the mayorality of The Hon ... [more]
A decent quality bridge across the Westquarter Burn, and the path up to Polmont Road, both part of the HArTT cycle route.
Quaternions i^2 = j^2 = k^2 = ijk = -1 This is the bridge where mathematician William Rowan Hamilton had the inspiration to unravel a problem he'd been thinking on for a while. https://en.wikipedia.org/wiki/Broom_Bridge
A single-sided sign for the routes available across the Grange Burn, but a low kerb rather than a proper dropped kerb at the end of the path. I wouldn't want to bump the bike over this when it is loaded with shopping!
A footbridge across the Grange Burn Flood Relief Channel, linking the Grange Burn path to Rannoch Park. The A905 and M9 motorway lie beyond.
The path alongside the Grange Burn, a bridge across the Grange Burn, and a sign for a completely cycleable walking route to Grangemouth Stadium.
The old road under the old railway bridge has been closed to motor vehicles, but remains open to cycling and walking into the Kinneil Estate.
The exit from Rannoch Park, a path from Rannoch Road, and their connection to the shared-use footway alongside Inchyra Road.
@TrothBen @CycleInfraDay @Fenmonkey @bencooper Here is my trike on the bridge. Not much room for anyone coming the other way. https://t.co/19Afh1W4Gc
According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. https://www.networkrailmediacentre.co.uk/news ... [more]
According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. https://www.networkrailmediacentre.co.uk/news ... [more]
Kurushima-kaikyo Ohashi Bridge Location: Koracho 2 Chome, Imabari-shi (Ehime Prefecture, Japan) Start of Shimanami Kaido
Fall hazard. Steel borehole lining and cap left projecting over an inch above the path surface next to the busy A606 at the M11 intersection
Fall hazard. Steel borehole lining and cap left projecting over an inch above the path surface next to the busy A606 at the M11 intersection
The Westburn Avenue shared-use footway crosses Westburn Avenue to get to the signalled crossing on Glenfuir Road and the bridge over the canal to the main towpath. The footway widening doesn't quite make it to the end of the shared footway.
New bridge over Bridgewater Canal on Vicars Hall Lane Bootstown Worsley https://twitter.com/BridgewaterWay/status/956556384149168129 this link shows the construction of the bridge .
'Cyclists Dismount' for going under the bridge with poor sightlines at Camelon Road. Why not just 'go slowly'?
'Cyclists Dismount' for going under the bridge with poor sightlines at Camelon Road. Why not just 'go slowly'?
The way to avoid the steps at #101523 is to take the A9 road bridge across the railway, and the HArTT cycle route appears to do just that. However, there is no evidence that the narrow footway is legal for shared use, and the provision ... [more]
As with #101515 the railway blocks progress along the Forth & Clyde Canal towpath, and a flight of steps provides the connection to the adjacent A9 road bridge.
The immediate way around the blockage in #101515 is to use this flight of steps up to the A9 bridge to cross the railway. The alternative is to use the road approach to the bridge to avoid the steps.
Poor photo but behind the trees a smooth obstruction free ramp curls up to this bridge over the urban dual carriageway.
A sign warning of the path junction up ahead. There's another beyond the junction facing the wrong way.
The path, rather than coming to an end as the sign suggests, crosses the A9 at grade, and continues across the far side. There is also a shared-use footway alongside the A9 to the right.
A safe route linking Bog Road to Callendar Boulevard along Callendar Road would provide a direct route between the Helix and Callendar Park. Even upgrading the footway to shared-use and putting in a crossing would probably suffice.
Mill Road bridge Measurements left to right in metres, accurate to 0.05m 2.30m Extra width by bins and bench 1.50m Pavement 3.05m Westbound Carriageway 3.05m Eastbound Carriageway 1.65m Pavement 9.25m Total 11.55m Total includ ... [more]
A "Cyclists Dismount" sign for a flight of steps. It may be better to direct cyclists via the road crossing (see #101513).
Extremely poor finishing at the expansion joint at the north end of the Eurocentral bridge over the M8 motorway.