You may also be interested in the automatic categorisation listings and themed galleries.
[Image taken 9.4.21] Marygate car park York. Sheffields partially blocked. Work seems to have stopped for the timebeing but the barriers remain. There's still no shortage of other space in the car park for siting the materials store. You … [more]
[Image taken 6.3.21] Tier electric hire scooters at the Spring Lane building at the University of York. See also #164995, #165018. For the list of all sites documented and issues see #164663.
[Image taken 6.3.21] Tier electric hire scooters at the Spring Lane building at the University of York. See also #164995, #165020. For the list of all sites documented and issues see #164663.
[Image taken 6.3.21] Tier electric hire scooters at the Spring Lane building at the University of York. See also #165018, #165020. For the list of all sites documented and issues see #164663.
[Image taken 4.3.21] Tier electric hire scooters at the Environment building, Wentworth Way, University of York. For the list of all sites documented see #164663.
Please dismount for the freshly laid 10 metres of straight tarmac that has recently been laid. What is this pointlessness? @GoBikeGlasgow https://t.co/q8wMpCpnXE
The Cycling Club in Keighley, although it appears to be a snooker club. https://www.bbc.co.uk/news/uk-england-leeds-47726687
Building works at Partick Bus Station have meant that the point where cyclists join Merkland St carriageway has now been closed, and cyclists are forced to share a narrow footway already obstructed by (unrelated) scaffolding. However, … [more]
Building work has now started at Partick Bus Station, resulting in railings being put across the point where it was easy to join the roadway in Merkland Street (see also #94587). Work is to last 9 months. … [more]
@twanduiv @GoBikeGlasgow @GlasgowCC @TwoWheeledTank city West way be gone to be replaced with horrendous non bike detour https://t.co/hIiKqwZ395
Shared use footway blocked by barriers around derelict building, with no diversion. Just as well the street is extremely quiet and doesn't really need shared use footways.
Building work on site adjacent to the Waterloo St cycle track has resulted in this covered walkway/cycleway being erected (see also #81087 & #81088).
Steps really? In a purpose designed cycle park? Are there steps on the ramps for the car parking? Being serious, this is an irritation but doesn't really detract from what is otherwise a pretty good facility. I haven't come across any … [more]
Two storey racks They seem better quality and more robust than the previous racks in the temporary cycle park. The bottom tier are awkward to use for tall people like me but the top tier seem fine. There are Sheffield stands too for … [more]
A big building visible from New Malden station. (Apologies that this doesn't appear to have any direct connection to Cycling, but I'm using to make a point about architecture.)
Frensham Great Pond information to right and toilets to left Location: , Farnham (England, United Kingdom)
Engine Arm aqueduct Location: French Walls, Smethwick (England, United Kingdom) Built around 1828 by Thomas Telford to carry the Engine Arm of the Wolverhampton level canal over the deep cutting of Telford's new Birmingham mainline … [more]