Old habits die hard when there's months between installation and commissioning, and this cyclist, despite having triggered the detector, went straight to the pedestian crossing rather than waiting at the cycle signals.
The Bunhouse Road cycle traffic signals are finally operational, about a year after installation. On this occasion the signal was triggered by someone cycling on the footway opposite. See also #183675.
The Bunhouse Road cycle traffic signals are finally operational, about a year after installation. However, some cyclists are continuing to use the pedestrian crossings, including this one who never pressed the button and had to wait a … [more]
A detector has been installed in the Bunhouse Road cycleway, but is so close to the traffic signal users will have almost stopped before being detected.
A zebra crossing on the Bunhouse Road cycleway. This one has tactile paving for pedestrians on one side only.
Just a small sign away from the main line of sight to warn of the cycle track crossing the access road to the Bunhouse Car Park, and no indication of priority.
The crossing of Bunhouse Road is a mess, and is currently partially blocked by hoarding. In the background a van driver has blocked the cycleway with his van, right next to some car parking spaces on the road, and near a large car park … [more]
The Bunhouse Road cycle track partially blocked due to it being used as a dumping ground for materials during roadworks on Argyle St/Dumbarton Road. The van parked on the footway beyond the cordoned off area was blocking the dropped kerb … [more]