Donate using PayPal

Tags: closed

You may also be interested in the automatic categorisation listings and themed galleries.

The path into the park is closed for works, but the diversion appears to be signed into the worksite! I used another route instead.

This part of the Clydeside path at Shawfield has been closed for so long without be any repairs being attempted that the sign is now faded and falling to bits. Whether it's @GlasgowCC, @SouthLanCouncil or @clydegateway that's responsible ... [more]

Pinkston Road still closed as Sighthill redevelopment continues.

The Garscadden Way and path to the Drumchapel Way is presently blocked by Scottish Water works, but the path to Annan Drive has been kept open. Conon Avenue has now reopened.

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. Other images of people on Terry Ave snapped today: #169586 and links

[Image taken: 4.4.21] Terry Avenue, York. The date of closure for year-long works for the Clementhorpe Flood Alleviation Scheme was pushed back several times. (It finally closed on Monday 17 May 2021.) I went out today to take images to hel ... [more]

No progress on rebuilding the south bank path (damaged by subsidence).

Access to the Village retail hub has been closed off, perhaps temporarily.

The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf

The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. http://www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf

The covered walkway at the SECC is temporarily closed, due to the use of the building as a temporary hospital.

Still no progress on fixing the riverside path.

The steps on the southwest side of the Queensway footbridge have been shut due to deteriorating concrete, leaving only the steps to the southeast for users. Perhaps it's time this footbridge was replaced.

This section of the busway cycleway is still closed.

The path north to Pinkston Drive has been closed and dug up.

The road to the replacement bridge at Bogside Road has not been completed yet. This will lead to #112836.

The road up to the replacement bridge has not been completed yet. Once it is finished, it is to be restricted to prevent through motor traffic from using it. This will lead to #112863.

The cycle track and walkway on one side of the Erskine Bridge has been closed, but I didn't see any signage to that effect at the bottom of the ramp.

Signage to the Forth & Clyde Canal outside the now closed Playdrome in Clydebank town centre, but no sign of any cycle parking.

Still closed more than a year after a bus crashed into here, see #90792

The new kissing gate (replacing #51060) has been blocked by Heras fencing. Wonderful! There is meant to be a cycle route being constructed between Calderbank and Eurocentral, coming through here.

The former staircase entrances to the Clyde Tunnel for pedestrians, closed due to social problems.

The path linking the South Bank path and Oatlands is presently shut while work is underway on rebuilding the Polmadie Bridge.

Richmond Park closed, why not visit Glasgow Green? Well, the Polmadie Bridge is down for starters.

The path across to Pinkston Road has now been closed for construction work.

The path south from Pinkston Road will be closed until the end of 2018.

The path south from Pinkston Road has now closed.

NCN75 closed at the SECC due to the Festival of Motoring of all things.

Rogerfield Road appears to have been commandeered for the motorway widening project. Another loss for active travel. Does Core Path status actually mean anything?

This ramp forms part of NCN75 and has been closed for a few weeks. See #88472.

Apparently Polmadie Bridge was found to be in such a perilous state that it had to be shut immediately, including closing the paths and river beneath it! Demolition is due to start on 12 October 2015. No replacement bridge has been proposed ... [more]

Footpath closed because it has collapsed into the sea!

After objections, the Fastlink busway carriageway over the Clyde Arc bridge will now permit cycling. But the plastic barriers at each end will only be removed once the buses are due to start running.

Oh dear - @Royal_Greenwich is closing a stretch of riverside cycle lane for driverless cars @GreenwichCycle http://t.co/Z8KLaqKVCR

Notice saying no access to cycle parking from 6AM on 16th November, but not saying how long for. Notice still in place two weeks later.

"Cycle Route SUSPENDED" for Commonwealth Games Always a good idea to give some sort of diversion signage (see #59999)

NCN75 closed for construction of the Smartbridge (seen in background), with diversion via Dalmarnock backstreets.

Path closed

The tramway cycle path shares a flyover with the actual tramway. If only this happened at the road crossings further west! It would have been even better if they'd not mounted the lighting columns within the width of the path.

Tramway cycle path closed off, even though it looks like work has been completed

Closed tramway cycle path beyond Edinburgh Park station and tramstop

Cycle path alongside tramway closed. It also looks like an unnecessarily steep ramp away from the path junction

Gates are closed across part of the Kelvin Cycleway (NCN756) after dark. How quaint!

Blockage

Stirlingfauld Place currently (2012) shut for redevelopment, blocking the quiet route through Norfolk Court to the Suspension Bridge, parallel to busy Gorbals Street.

Closed bridge over River Kelvin on path from Balmore to Cadder. A replacement bridge is to be built by East Dunbartonshire Council some time in the 2012/13 financial year. UPDATE: The replacement bridge has now opened! (March 2013) Se ... [more]

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/closed/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.