Donate using PayPal

Tags: construction

You may also be interested in the automatic categorisation listings and themed galleries.

Construction work at Clyde Place, including a replacement cycle path and cycle parking. The riverside path is open (to the right).

The resurfaced section of the Forth & Clyde Canal towpath will tie into the work at Stockingfield Junction, where a bridge is being built across the canal.

Work blocking the South City Way cycle track on Pollokshaws Road, and also showing the general layout at toucan crossings along the route.

Work progressing on the new bridge across the Forth & Clyde Canal at Stockingfield Junction.

Fountainwell Road is presently closed in Sighthill, so St Rollox Drive is temporarily not a through road. The road on the right has been opened, and is presently the sole road access to the residential area of Sighthill.

The path between Craighall Road and Pinkston Road is now closed for construction work. This path leads to #165573.

The path alongside the motorway, between Pinkston Road and Craighall Road, has been closed. In the original publicity material it was stated that "constant access" would be maintained along this path, although given the nature of the work t ... [more]

The Forth & Clyde Canal towpath is now shut at Stockingfield Junction for construction of a new bridge. Signed diversions have been put in place. In the opposite direction, the closure is at Ruchill Street. On the opposite bank, the path ... [more]

Messy obstructed cycleway on Douglas Street, with a totally inappropriate surface. Just like the one on Waterloo Street to the left (see #95475 and #95476).

Temporary protected bike lane for Metro Tunnel works on Swanston Street, Melbourne Location: Melbourne City Centre (Victoria, Australia)

It's December 28th. Seems like they've scheduled a whole lot of work for December 30th-31st!

There are a lot of construction markings on the eastern side at Happendon Services. Will the cycle route actually benefit from an upgraded facility or will there just be sliproads to cross?

Grantchester Meadows path. Thistles and nettles growing out of the fence by 1m. These will reach half way across the new narrow shared path, visible in the background. Narrow paths, encroachment by vegetation, these are not new problems. ... [more]

Grantchester Meadows path. New 1.5m wide path under construction, tight to the fence. This will be just as unsatisfactory as the existing narrow path alongside Skater's Fen. Why such a narrow path when there is so much space available? An ... [more]

The entrance to Richmond Park now doubles as the construction site entrance. NCN756 is unuseable since there is no way through to the riverside other than the steps next to Rutherglen Bridge (see #95375).

Looking through the compound gate, a new road has been built through what was Richmond Park. I don't suppose that row of trees on the right is staying much longer.

Give way to construction traffic in Richmond Park.

On a lovely #CamRideHome along the great new #StowQuyLode cycleway we found some potential substructure issues. Please see https://t.co/Z4gDu1AEzx for the full details and video. https://t.co/u6orHdxp77

Part of Richmond Park has been sold for housing, and thus NCN756's route is presently severed.

NCN756 blocked off at Richmond Park, part of which has been sold off for a housing development. The path to the left leads to a flight of steps.

The path beyond the fence in #95371 has already been built, but isn't being maintained since it is within a construction site.

The path into Richmond Park doesn't actually connect to the main part of the path at the moment due to further house building.

The crossing of Bunhouse Road is a mess, and is currently partially blocked by hoarding. In the background a van driver has blocked the cycleway with his van, right next to some car parking spaces on the road, and near a large car park j ... [more]

The cycleway crosses the A8 sliproad on an uncontrolled crossing to the right of the mini-roundabout. When I crossed, a driver stopped to wave me across when I suddenly appeared from behind a van. I get that there are roadworks going on, ... [more]

Westlake Cycle Track progressing

A path undergoing reconstruction, with installation of lighting, in Cardonald Park.

Will be another bus-stop bypass on Huntingdon Rd. Island built, cycleway next. I passed this on a bike while bus was in stop. Constant stream of 30mph traffic which I had to merge into. Certainly reminded me why the bypass is needed!

New housing development in Broxburn closing gap in A89 cyclepath - see also #37325

New housing development in Broxburn closing gap in A89 cyclepath - see also #37326

View of the link railway construction area just north of Hitchin. The railway will fly over the East Coast main line and join the Cambridge branch.

Construction of the new pathway between Westway and Essex Hall Road, and eventually North Station.

The new pathway between Westway and Essex Hall Road has been opened up somewhat prematurely.

Construction of new cycleway connecting the Garrison route to Ypres Road and further along, Circular Road South.

The long-awaited toucan crossing of Layer Road, linking the Boadicea Way cycle lane and Garrison route is taking shape.

Adding the top layer at the new Layer Road toucan crossing.

Progress at the new Layer Road toucan crossing, connecting the Boadicea Way cycle path and Garrison route.

Construction of the long-awaited crossing of Layer Road, connecting the Boadicea Way cycle path and the Garrison Route has begun. As part of the works the bus stop is being relocated.

Work has begun on the long-awaited crossing of Layer Road, connecting the cycle path along Boadicea Way and the Garrison Route.

New cycle path under construction connecting Berechurch Road to the Garrison Route.

New cycle path under construction connecting Circular Road South and the Garrison Route.

New cycle path under construction formally connecting Ypres Road to the Garrison Route.

New cycle path under construction connecting Ypres Road and the Garrison Route to Berechurch Road.

While new cycle ways are under construction (see #25372 and #25373) cyclists have to work out their own diversion route.

While work is carried out creating new cycle ways (see #25372 and #25373) at the end of Ypres Road, it is blocked off. However the other side of the works cycle network exists and there should be a diversion in place for cyclists to get to ... [more]

Construction work of the new cycleway - it looks like the path will be at least as wide as that truck.

New wider shared pathway alongside Boadicea Way is under construction, as part of the next phase of Cycling Town.

New, wider shared pathway alongside Circular Road North is under construction, part of the next phase of the Cycling Town project.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/construction/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.