Something has happened that has caused the still fairly new main riverside path to be closed. Diversion via the secondary path.
Building works at Partick Bus Station have meant that the point where cyclists join Merkland St carriageway has now been closed, and cyclists are forced to share a narrow footway already obstructed by (unrelated) scaffolding. However, t ... [more]
Like the sign in #89462 said, the footway of the A725 at Bogs Brae is currently shut, but the new shared footway can be seen in the background under construction.
Since the old footway around the Raith Interchange has been dug up, and the new footway (including the two new footbridges) is not finished, there is currently (May 2017) a free shuttle bus connection. It picks up here near the entrance to ... [more]
City Centre footpath diversion - Coventry - subways to the city centre Location: Parkside, Coventry (England, United Kingdom) When I arrived in Coventry, I had to find a way to the city centre. An overpass of the Coventry Ring Road ... [more]
The new path alignment along the south bank of the Clyde, with a straight path under construction in place of previous path with steps. #84282 shows view from other end. Update of the completed path at #86787.
Work underway on creating the Clydebank North Circular Link alongside the A82. The footway beyond the bus stop is closed for surface repairs. This bus stop and shelter was only recently put in but no account appears to have been made of ... [more]
Work underway on creating the Clydebank North Circular Link alongside the A82, approaching bus stop. www.west-dunbarton.gov.uk/roads-parking-travel/road-safety/road-safety-walking-cycling/