Donate using PayPal

Tags: hirebike

You may also be interested in the automatic categorisation listings and themed galleries.

Potholes and faded road markings on Killermont Street, and a hire bike with a puncture.

North and South lifts are not working today 😕 https://t.co/SojWswoRBt

The visitor bike parking at the Kelvingrove Art Gallery is full of hire bikes, so this visitor has locked to a lamppost near the entrance.

[Image taken 12.10.22] Deangate, York. In 2022, CYC agreed a change to the terms of the Tier hire e-cycles (see: #185003, scheme overview: #164663). They can now be left at public cycle parking. But I see some flyparked or, as here are … [more]

The visitor cycle parking at Kelvingrove Art Gallery now full of hire bikes.

The last of the Nextbike bolt-down stands has succumbed to the inevitable, and now there are only the visitor parking stands left at the Kelvingrove Art Gallery.

University Avenue at the western limit of its reworking. Note the centre line is less restrictive than the lane lines.

All but two of the original Nextbike hire stands at the Kelvingrove Art Gallery have been removed, and the fixings on those remaining are partly pulled out, so hire bikes are being left on the visitor cycle parking stands, causing … [more]

An abandoned Nextbike e-bike in Kelvingrove Park. A new roadway has been built connecting the park to the university exit road, in addition to the adjacent new path.

Cycle parking stand relocated during works at Glasgow Science Centre, but mostly full of hire bikes.

Cycle parking at the Kessington shops, with a Glasgow Nextbike hire bike present.

New Nextbike hire station at Anniesland Cross.

The southern entrance to Partick station is becoming a bit cluttered, and is being used for car parking, including over the path, which is also partially blocked by hire bikes.

A total lack of cycle facilities on Govan Road at the Pacific Drive junction. On the right is an approach lane for the Fastlink busway on Pacific Drive.

The cycleway at Charing Cross.

The signs say mandatory right turn, but the cycleway on Sauchiehall Street is two-way, so cycles should be exempted. The signs should also be 'mandatory right turn ahead' to diagram 609, due to their position in relation to the junction.

London Road cycle track.

The Kelvin Hall now has replacement cycle parking, and it has been located in the former taxi drop-off lane outside the front door. UPDATE 2021: This has now been removed, see #173729.

Not all loading is essential*. Clerkenwell Rd needs kerb-protected bike tracks. Paint doesn’t work. *(London officially has the tastiest tap water in the world). https://t.co/xChTttRZEA

The contraflow lane on Gordon Street, with a cargobike and a hire bike in use.

A comparison of hire bikes at the CEoGB AGM.

Cycle parking and hire bikes at Morecambe station, although the hire bikes seem to be taking over the passenger cycle parking too.

Hire bikes in various states of distress, in Argyle St precinct.

The cyclist in #62731 starts away once the cycle signals have returned to red and signals for motor vehicles have changed to green.

A cyclist (the only Citybike hire bike rider I saw all day) watching the wrong signal and ignoring the cycle signals he's stopped beneath (see #62732).

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/hirebike/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.