You may also be interested in the automatic categorisation listings and themed galleries.
Diversion signage for the Stockingfield canal path closure. The signs have been fixed quite low down the pole.
Route signs and temporary diversion signs for the Stockingfield canal towpath closure. Lots of leaves are rotting away, awaiting being swept off the Kelvin Walkway.
Footway car parking outside new student accommodation, including reversing across the shared-use footway/cycleway. There is plenty available on-road car parking, and a cheap all-day car park next door (behind the trees).
The crossing of Bunhouse Road is a mess, and is currently partially blocked by hoarding. In the background a van driver has blocked the cycleway with his van, right next to some car parking spaces on the road, and near a large car park … [more]
As welcome as the rebuilt paths connecting to the Kelvin Walkway are, some have brought thier own problems, including here mud washing down onto the main path. There were problems here before, but now worse than ever! The sign covered in … [more]
The Kelvin Walkway at the Kelvin Aqueduct. A pity about the kink in the path still being present. Awkward and annoying when you're just picking up speed from the preceding narrow climb and blind corner.
It's hard to believe that this path is only a few weeks old. Unlike the other rebuilt paths linking to and from the Kelvin Walkway, this riverside path was not asphalted, but instead has been given a loose surface. Unsurprisingly, it is … [more]
Unlike the other rebuilt paths linking to and from the Kelvin Walkway, this riverside path was not asphalted, but instead has been given a loose surface. Unsurprisingly, it is already wrecked after the first heavy rain since it was built. … [more]
Unlike the other rebuilt paths linking to and from the Kelvin Walkway, this riverside path was not asphalted, but instead has been given a loose surface. Unsurprisingly, it is already wrecked after the first heavy rain since it was built. … [more]
Welcome as these improved paths are, they've caused problems on the main Kelvin Walkway, including mud washing down the hill.
An unnecessarily sharp turn at the junction of the Kelvin Walkway and the path to Southmuir Place. This could potentially be a main route into North Kelvinside and the West End from the Kelvin Walkway. No addition to the signpost to … [more]
Access to the new access path to the Kelvin Walkway in #89472 still needs work done at Bantaskin St. Maybe it isn't finished.
A new surfaced path has replaced the previous boggy access to the Kelvin Walkway from Bantaskin St, seen in #58918.