You may also be interested in the automatic categorisation listings and themed galleries.
Construction of Non-Motorised User path from the Gogerddan Campus (the Institute of Biological, Environmental and Rural Sciences) of Aberystwyth University to the new Bow Street station, opened in February 2021.
08_2013_37 Local cycle route near A14 Cambridge to Huntingdon [See nearby tab for other photos of this sign]
End of path from A1 footbridge (see nearby photos for barriers) at Tempsford, opposite Station Road.
01_2016_051 Cycle route alongside the A27, near Chichester, January 2016 [I think he missed the 'Cyclists Dismount' sign at the foot of the ramp to the footbridge]