You may also be interested in the automatic categorisation listings and themed galleries.
The path linking the South Bank path and Oatlands is presently shut while work is underway on rebuilding the Polmadie Bridge.
The ramp up to New Rutherglen Road is signed as shared use, but doesn't connect well with the toucan crossing and the shared footway along Polmadie Road (see also #99165).
The footway in the foreground was widened when it was converted to shared use (although the lampposts were left where they were), but beyond the toucan crossing the section to the shared use ramp to Old Polmadie Road has been left at its … [more]
When the Polmadie Bridge is rebuilt, the route to Glasgow Green will be straight ahead, across the split toucan crossing and down the ramp to Old Polmadie Road.