You may also be interested in the automatic categorisation listings and themed galleries.
[Image taken 17.3.23] Burton Stone Lane, York. Context: #189234 and #191693. Parts of Burton Stone Lane were patched and resurfaced in late (December?) 2022 and, as here, in March 2023. Other image this subject today: #192135. Other image … [more]
The resurfaced footway of the otherwise abandoned Swordale Place. In combination with Kildermorie Road, useful for local trips across Easterhouse, avoiding the main roads, but with all the broken glass and other debris, a very unattractive … [more]
[UPDATE: Week commencing 6.3.23 the full width of BSL here was resurfaced] [UPDATE: An email from CYC dated 3.3.23 says: "I’ve checked this with my colleagues and I can confirm that the area you’ve highlighted is included within our … [more]
[Image taken 25.7.21] The approach (on both sides) to the pedestrian crossing between Dunelm and the shared-used cycle-ped-wheelchair link between this retail park and the neighbouring one (see: #161559), has been resurfaced. It had … [more]
A new steps and ramp access to the canal towpath is being built at the Centre81 community centre in Whitecrook. The towpath here has been resurfaced over a short distance.
The path from Prospecthill Circus to Polmadie Road is being rebuilt. This end is pretty much complete.
Wow - what a great job, never enjoyed a new bit of tarmac so much! This has made my ride to The Green Dragon bridge even more of a marvellous pleasure. https://t.co/FYockbeTNF
The John Muir Way in Bo'ness has been resurfaced with smooth asphalt, and solar LED catseyes for lighting. However, the level crossing kissing gates remain.
The John Muir Way in Bo'ness has been resurfaced with smooth asphalt, and solar LED catseyes for lighting.
The John Muir Way path on the waterfront at Bo'ness has been resurfaced in smooth asphalt with solar LED catseyes for lighting.
Only the eastbound cycle lane has been restored (so far). Some parts have be resurfaced, others have not. Note the milestone still in place on the right.
Compacted gravel (although top surface is still rather loose) has been added atop the resurfaced section of shared-use pathway through High Woods Country Park. See also #70739.
Some of the shared use pathway through High Woods Country Park has been resurfaced (see #65169 prior to resurfacing). Unclear if it's going to remain as it is or have a gravel coating applied to be in keeping with original path, or when the … [more]