Donate using PayPal

Tags: school

You may also be interested in the automatic categorisation listings and themed galleries.

The railway path into East Kilbride, NCN756, with a sign for "Primary Schools" off to the left.

The cycle route to Stewartfield along West Mains Road, opposite St Kenneth's Primary School, hence the part-time 20mph limit.

The Calderwood Road shared footway, with a bus shop, footway parking, and a pinch-point crossing on the road across to a school.

Give way at the schools entrance.

Both paths have cycle signs on them, so possibly could divert if a heavily laden bus pulls up and starts unloading, but otherwise the left path goes directly to the school and the right is for following Calderwood Road.

The original cycle track leads cyclists out onto the busy Whitemoss Road carriageway. But the footway has been made shared use, without a connection being made between the cycle track and the footway to allow transfer onto the shared footwa ... [more]

The shared-use footway alongside one side of the busy Whitemoss Avenue.

A slightly wider path next to Greenhills Primary School, although the lampposts have been planted within the width of the path, making it effectively slightly narrower.

Barriers across the path at Curlew Drive, the Crosshouse Primary School access road.

The start of the West Thomson Street cycle lane, opposite Clydebank High School.

A poor quality shared-use footway on Halgreen Avenue. The other side of the road doesn't even have a footway, even though it is outside a school!

Bollards don't need to be ugly. These bollards are disguised as novelty pencils outside Ludworth Primary School.

The end of the Hallglen cycle path at Hallglen Primary School.

A shared-use path starts on the left, to avoid the junction ahead, although NCN76 appears not to use it and instead turns at the junction, then turns again onto the next section of the same path. The dropped kerb is also far from flush, ... [more]

A painted cycle lane has been provided through the traffic calming pinch-point, but only in one direction.

A new sign has appeared

Covered cycle parking at a school.

Sale in Trafford - Woodhouse Lane East near parade of shops UPDATE 2018 09 25 amazingly cycle parking has appeared 4 on this corner and 2 at the other #102440 needs cycle parking outside shops to match the number of car parking spaces

Broadheath Trafford the segregated cycleway is compromised by the creeping veg

Broadheath near Altrincham A56 parallel path.. An 2 frame barrier does not allow easy access except to the smallest of cycles . No cycing sign needs removing as well.

Broadheath near Altrincham A56 parallel path.. An 2 frame barrier does not allow easy access except to the smallest of cycles .

Broadheath near Altrincham A56 parallel path.. An A frame barrier does not allow easy access except to the smallest of cycles .

Broadheath near Altrincham A56 parallel path.. dropped kerbs are still NOT in place !!

Broadheath near Altrincham A56 parallel path.. This chicane has had one section replaced creating a barrier where it was once a decent width. dropped kerbs are still NOT in place !!

The path here has been vastly improved following the building of a Gastro Pub adjacent. See how it used to be #53625

The path past Woodlands Primary School in Greenfaulds.

Ashton under lyne open a filter here

It doesn't look like maintenance of the cycle parking shelter is particularly high on the school's agenda.

Altrincham - Dunham Road to Racefield Road and Groby Road dropped kerbs required to allow cyclists to avoid busy Dunham Road and a route to/from John Leigh Park

Broadheath off Sinderland Road.Temporary path is better than the original https://www.cyclestreets.net/location/53626/ . Would be good if McGoff can lay temporary path over old railway line see https://www.cyclestreets.net/location/53625/ ... [more]

Would be a good walking or cycling path. Shared use next to massive #Holyrood school though? #GlasgowCycleInfraDay17 https://t.co/uFQ47EK5uv

Netherton shared use path looking towards Wildridings Square, away from Wildridings School Location: , Bracknell (England, United Kingdom)

Netherton shared path, near Wildridings School Location: , Bracknell (England, United Kingdom)

Traffic calming road-narrowing outside a school in Tinto Road, with broken bollards.

Roscarrock Hill, Port Isaac looking toward the old school, which is used as Port Wenn school in the tv series Doc Martin.

The broken line suggests that cyclists are meant to give way to turning motorists. This should be erased, and the cycle lane marking continued across the junction. The 20mph school speed limit sign needs realigned to face oncoming traffi ... [more]

Sale in Trafford - Woodhouse Lane East near parade of shops UPDATE 2018 09 25 amaizingly cycle parking has appeared 4 on this corner and 2 at the other # needs cycle parking outside shops to match the number of car parking spaces

Narrow road past school with lots of motor traffic. But excess motor traffic is a problem right across Ayr.

See clip at https://youtu.be/nZWFdDs7GSg

DE60 MDZ Bowmans Tranport lorry parked up on school zig-zag at school arrival time. Lorry looks to be waiting to deliver, no need to wait here though. Plenty of space a few hundred yards away and not putting kids in danger. The ... [more]

Great to see a decent amount of good quality cycle parking at Coleridge Community College.

UPDATE SEE #84218 Manchester Sale Moor Fast 2 lane slip road onto Mway requires zebra crossing here. And on 1 lane slip road off Mway crossing shared path see also #80549 To avoid confusion the crossing should be painted with cycle icons as ... [more]

Broadheath Altrincham Turnbull Road. A zebra crossing connects 2 cycleways and 2 shared footways. Recently installed..As this is connecting shared footways cyclists are allowed to cross. This type of crossing is an example of a Tiger/Sha ... [more]

Speeding, pavement parking and rat running, just a typical Manchester street. Just posting 20 mph speed limit signs is not enough on a wide residential street. https://twitter.com/juststepsways/status/709841734285598720 https://juststepside ... [more]

A narrow but useable segregated cycle track past a school in Easterhouse. Unfortunately, a traffic island just beyond the far end of the cycle track forces motor traffic in towards the kerb, creating conflict.

Students Without Borders Grade 10 girls cycle over from #Nepal to #India for class https://t.co/oAfy5U8YAl https://t.co/bouFSeKgM8 The article explains: “As the road condition to Rangapur is bad, people prefer to send their childr ... [more]

A raised block has appeared to segregate the previously painted (see #43674) two-way cycle lane.

The route sign here says NCN74 turns left down Bridge Street, but there is another sign further down Bridge Street that refers to route (74) meaning that the road leads to route 74 and isn't itself route 74. There are other signs for 74 fur ... [more]

A random piece of shared-use footway alongside a usually quiet back road. Location: Victoria Park, Glasgow (Scotland, United Kingdom)

Chelsea tractor on the school run Most children walk or cycle to this local child nursery. One selfish mother parks her black Mercedes SUV right at the entrance, blocking the pavement and much of the narrow road. Pictures of a similar ... [more]

Mercedes SUV at child nursery Most children walk or cycle (see picture #19078) to this local child nursery. One selfish mother takes her Chelsea Tractor on the school run and parks it right at the entrance, blocking the pavement and much ... [more]

Kids bikes cycle parking at a nursery in Oldenburg. So far only one parent regularly blocks the pavement with an SUV, see #67268

A warning sign that has been made as inconspicuous as possible.

Bicycle parking inside russian middle school back entrance. It's unsupervised and about 7 years old when city mayor popularized bicycles.

See clip at http://youtu.be/gOeMarpER4A Some of the barriers have been removed to make this route accessible by cargo bikes and child carriers. About time, given it goes to a local primary school!

See clip at http://youtu.be/gOeMarpER4A Some of the barriers have been removed to make this route accessible by cargo bikes and child carriers. About time, given it goes to a local primary school!

Gate at entrance into school grounds from Ravelston Woods. It was open when I arrived.

Sun is shining, weather is sweet, come to #Glasgow Green and pedal with your feet #cycling #school #holiday http://t.co/DJplka9asn Freewheel North at Glasgow Green

Pick-up time at Newnham Croft school - a solid line of bikes leaning on the wall.

Car reg S57 LM0 blocking the cycle lanes that bypass the traffic calming outside Coleridge College. This has been an ongoing issue since the traffic calming was installed. It takes just one selfish individual to put at risk the thousands of ... [more]

Manchester Victoria Station Cycleway across tram lines and on to Chethams school of music. Road works here with temporary traffic lights with no thought whatsoever for the stranded cyclists here !

Broadheath near Altrincham A56 parallel path. Desire lines through the estate have many chicanes requiring attention to remove. This chicane has had one section removed creating a decent access however the dropped kerbs are still NOT in pla ... [more]

Broadheath near Altrincham A56 parallel path. Correct signage to warn against motorcycle abuse but OTT chicane needs attention/removal.

Broadheath near Altrincham A56 parallel path. Access to path network with appropriate warning signs RE motorcycling. Remnants of kissing gate could do with removal to allow decent access.

UPDATE 27/11/2015 A bridge is proposed to be installed on East side of a56 connecting Wharf Road. A lift bridge at both locations may be options to consider #47684 Broadheath near Altrincham A56 parallel path leading to Jublilee Way (Bloo ... [more]

Broadheath near Altrincham A56 parallel path: Gate needs removal or redesigning

UPDATE 2018**** The surface has been improved allowing access to the nearby school and the new Gastro Pub here see #101747 ********Broadheath near Altrincham A56 parallel path in need of surface improvement

UPDATE 3 2018 **** Unlike other access points the worn surface here has NOT been replaced with trailflex http://www.sudstech.co.uk/wp-content/uploads/2017/10/2017-09-27-11.06.06-min.jpg It's still a little tight for anyone with a mobility ... [more]

Stretford near Victoria Park and St Anns primary schools - Crazy cycle lane with legal car parking on approach

Great to see some new covered cycle parking at this school. The remnants of the old horrible concrete slots are visible in the foreground.

Steps and ramp down into underground cycle parking at Cäcilienschule, Oldenburg (at water level, between a river and a draining lake). In addition, this grammar school counts with two cycle parks at ground level. More on video http://iitm. ... [more]

New shared-use footway past primary school on Primrose Street. No provision for cyclists to join the road until half-way along if footway busy with kids going into school.

Passing John Cleveland College on Butt Lane, Hinckley.

Children cycling to school. http://www.camcycle.org.uk/newsletters/77/article15.html and http://www.sustrans.org.uk/assets/files/Safe%20Routes/publications/routes2action/SRS_R2A_17.pdf page 3.

A NEW bike hire scheme for the Sale West area in Traffiord Manchester http://www.messengernewspapers.co.uk/news/10220813.Residents_SWAP_bike_tips/

SALE in TRAFFORD UPDATE the path has been closed but there is still acces to get through. The erection of the fence has done nothing to counter the veg creep. Footpath and open land is threatened with closure UPDATE there is still time t ... [more]

Sorry, the only picture and its moved: The Nuffield Close - Nuffield Road - Green End Road - Bramblefields LNR walk with (ltr) Bob Menzies (Head of Major Infrastructure Delivery), Cllr Ian Manning (VIE Residents'), Cllr Ian Bates (Cabinet M ... [more]

Cycle parking at Chartham Primary School.

Improve Nuffield Road Petition We, the current and the possible future users of Nuffield Road, request that: - A new access to the industrial and trading estate on Nuffield Road is built from Milton Road along the first section of the ... [more]

The construction of the Science Park Station should provide an opportunity to improve Nuffield Road http://www.camcycle.org.uk/jumpto/ScienceParkStation . See also picture #46666.

Nuffield Road is a mixed-use area with a primary school, a large medical centre and housing, as well as large warehouses and industry. Nuffield Road has been identified as one of the main routes for walking and cycling to the new station. W ... [more]

Separate industrial and residential traffic on Nuffield Road: http://www.camcycle.org.uk/jumpto/ScienceParkStation . See also #46664.

The school run in the most cycled city in England. See also #46663 and compare to http://iitm.be/schoolruninassen

Separate industrial and residential traffic on Nuffield Road http://www.camcycle.org.uk/jumpto/ScienceParkStation . See also #46662.

We have suggested that Nuffield Road’s residential section be cut off for motorised through traffic just past Discovery Way (in the bend by the allotments), and that the industrial section of Nuffield Road be opened up to Milton Road via ... [more]

Shirley School has already seen accidents in front of the school gates. The risk is that the likely increase in traffic for the new station and an increase in onstreet parking will cause the area to deteriorate drastically, if the industria ... [more]

Local residents have suggested that Nuffield Road’s residential section be cut off for motorised through traffic just past Discovery Way (in the bend by the allotments), and that the industrial section of Nuffield Road be opened up to Mil ... [more]

Nuffield Road is a mixed-use area with a primary school, a large medical centre and housing, as well as large warehouses and industry. Nuffield Road has been identified as one of the main routes for walking and cycling to the new station: h ... [more]

The school run in England's most cycled city. Shirley School on Nuffield Road in East Chesterton, Cambridge, Cambs. See also #46657 or compare to http://iitm.be/schoolruninassen

Taxi with number plates SD57 BFO overtaking dangerously near a marked primary school zone. More Nuffield Road pictures #46656

Desperate taxe with number plates SD57 BFO overtaking dangerously near a marked primary school zone. More Nuffield Road pictures #46655 and videos at http://iitm.be/NuffieldVideos

‘We want to see Nuffield Road closed near the planned access to the new station and building a new access from Milton Road to the industrial area.’ http://www.camcycle.org.uk/jumpto/ScienceParkStation . See also #46654.

If you live in East Chesterton, beware of the fly-parking menace! The county council has no plans to tackle fly-parking. All they want is to maximise the return from the Science Park station car park: http://www.camcycle.org.uk/jumpto/Scie ... [more]

The main foot & cycle station access alternative to the Bramblefields Nature Reserve is through Nuffield Road - http://bit.ly/VY5snZ -, which during a large part of the mornings is blocked with cars on the school run mixed with many HGVs an ... [more]

Separate industrial and residential traffic on Nuffield Road: http://www.camcycle.org.uk/jumpto/ScienceParkStation . See also picture #46651.

Local residents propose to open up the business section of Nuffield Road to Milton Road via Nuffield Close and the first part of the guided busway, which should therefore not have a guideway track. The industrial section of Nuffield Road co ... [more]

Nuffield Road is likely to become one of the main routes for walking and cycling to the new station as well as for kiss-and-ride journeys. Nuffield Road is a mixed use area with a primary school, a large medical centre, residential dwelling ... [more]

With the construction of the Science Park Station Cambridge Cycling Campaign asks to improve access routes for cyclists and pedestrians (e.g. through Nuffield Road for the medical centre and the school run) and to reduce conflicts with moto ... [more]

The risk is that the likely increase in traffic for the new station and an increase in onstreet parking will cause the area to deteriorate drastically, if the industrial part is not sectioned off from the residential stretch: http://www.cam ... [more]

We have suggested that Nuffield Road’s residential section be cut off for motorised through traffic just past Discovery Way (in the bend by the allotments), and that the industrial section of Nuffield Road be opened up to Milton Road via ... [more]

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/school/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.