Donate using PayPal

Tags: temporary

You may also be interested in the automatic categorisation listings and themed galleries.

Yet another temporary closure for a commercial event in Glasgow Green, closing many of the paths in the western section of the park, including NCN75. We ended up going via Monteith Row, along the northern edge of the park.

While the Nithsdale Road railway bridge is being rebuilt, the Strathbungo footbridge in Moray Place has been made accessible, in advance of its permanent replacement. The work involves timber ramps at each side, leading to a step-free … [more]

Temporary cycle parking on the grass verge at the Riverside Museum while the regular cycle parking is out of bounds due to construction work.

Temporary barriers have returned to close off the Kelvingrove Art Gallery pedestrian and cycle access from use by drivers.

[Image taken 8.5.22] Looking away from York towards the temporary path on NCN65. Position very approximate. [Note: No street view at this location.] A clear faultline between old (damaged) and new (pristine) tarmac. Until around January … [more]

[Image taken 8.5.22] Looking towards York on NCN65. Position very approximate. [Note: No street view at this location.] A landmark people who use the path with recognise but visible from much further away on this temporary path. Other … [more]

[Image taken 8.5.22] Looking towards York on NCN65. Position very approximate. [Note: No street view at this location.] Smooth tarmac nearly 3m wide. Other images here today and links: #182563.

[Image taken 8.5.22] Looking towards York from close to the access to NCN65 from Rawcliffe Bar Country Park. Position very approximate. [Note: No street view at this location.] Undamaged tarmac. Unweathered wood. And a cattle grid that … [more]

[Image taken 8.5.22] Looking towards York from close to the access to NCN65 from Rawcliffe Bar Country Park. Position very approximate. [Note: No street view at this location.] Context: #176152. The alternative route during the Clifton Ings … [more]

A temporary closure of NCN75 Clyde Walkway starts tomorrow, for 7 months, as far as the Smart Bridge. Yet again, the steep ramp at the Rutherglen Bridge access point here (see #98398 and #71262), will be showing how useful replacing it … [more]

Confusing signage for the COP26 diversion that has now ended.

COP26 diversion signs on Old Dumbarton Road. The one on the tree is indicating separate diversion routes for walking and cycling, due to the direct route along Argyle Street being quite a busy main road.

A sign advising of the diversions for NCN routes 7, 75 and 756, facing people heading away from the diversions.

So is the diversion for NCN7 straight ahead, or left?

Fallen signs on the path, and temporary signs that aren't too helpful (see #175562).

The pop-up cycle lane at Lancefield Quay is now being used for signage. The signs include "CYCLISTS" is very small print.

The pop-up cycle lane at Lancefield Quay is now being used for signage.

Is this sign meant to be in use?

Temporary signs obstructing the northern end of the Benalder Street cycleway. Still no progress to report on the installation of traffic signals implied by the stopline and pedestrian crossing studs, or how the cycleway ties into the road … [more]

Cycle parking stand relocated during works at Glasgow Science Centre, but mostly full of hire bikes.

People make Glasgow difficult to cycle around. Another closure of McPhater Street on the Colleges Cycle Route. The parallel main road behind is not closed.

Signal controlled pedestrian crossing, albeit temporary.

"Cycle Lane Suspended" - no further details. Roadworks are taking place in the contraflow cycle lane in Howard Street ahead. A diversion could have been set up via Dixon Street and Fox Street. See also #170199.

One day I'll come along here and it will be open. There's a continuous cycle track around the corner into Possil Road which continues as far as Baird's Brae. A short connection has been built in St George's Road, which will later be … [more]

The Garscube Road cycleway still unopened at Possil Road. See update at #171177.

The Tradeston Bridge is presently shut for work to be done.

The Garscadden Way and path to the Drumchapel Way is presently blocked by Scottish Water works, but the path to Annan Drive has been kept open. Conon Avenue has now reopened.

A small route sign almost unreadable due to stickers (and appears not to mention the one route where there is a cycle facility), and a fallen diversion sign blocking the gutter. Providing a path in the park to connect to the segregated … [more]

Temporary signs placed in cycle track, blocking the entire width, again.

Fountainwell Road is presently closed in Sighthill, so St Rollox Drive is temporarily not a through road. The road on the right has been opened, and is presently the sole road access to the residential area of Sighthill.

[Image taken 16.3.21] York: Bishopgate Street junction with Price's Lane. The image clearly shows the space for passing a cyclist - advisory lanes - in either direction is insufficient. After taking this pic (from the pavement), I rejoined … [more]

Fountainwell Road is presently closed in Sighthill, so St Rollox Drive is temporarily not a through road.

The signed diversion route is shut! Still no dropped kerb.

Ambiguous diversion sign for pedestrians and cyclists (the closed "footway" is the path from Craighall Road to Pinkston Road, alongside the motorway), and fancy electronic sign for motorists.

No change to the diversion signs in #95364 and #95363.

The path between Craighall Road and Pinkston Road is now closed for construction work. This path leads to #165573.

If that's the sign to declare the path ahead closed, it's no use lying face down.

The bridge between North Wallace Street and Sighthill is being replaced, and diversions have been signed to Craighall Road and Pinkston Road.

Pedestrians and cyclists diverted into the presently dead-end Pinkston Road, but motorists are not.

"Cyclists Dismount And Use Footway" - the Sighthill diversion route appears to have been signed along the footway of various roads, none of which are actually signed as being shared use, so why dismount here?

The path alongside the motorway, between Pinkston Road and Craighall Road, has been closed. In the original publicity material it was stated that "constant access" would be maintained along this path, although given the nature of the work … [more]

A sign for the diversion due to the closure of the path between Pinkston Road and Craighall Road. There are no longer signs displayed for the diversion between Pinkston Road and Charles Street.

The path between Pinkston Road and Craighall Road has been closed, and the footbridge across the motorway to North Wallace Street has been removed. Diversion signs are in place along Baird Street and Dobbie's Loan. However, the diversion … [more]

[Image taken 21.6.20] York: Bishopgate Street junction with Price's Lane. See also: #165589 I have uploaded it to show the narrowness of the cycle lane, the carriageway, the bend, the walls. The signs and cones have long been removed. They … [more]

UPDATE See: #167917 [Image taken 2.3.21] Blank hoardings on Bridge Lane, York, the ped-cycle route along one side of York Hospital. This very well used link runs between the 'Glass Bridge' (the footbridge with cycle gulleys over the … [more]

Useful cut through temporarily closed, with explanatory note emphasising that it will re-open as soon as possible.

The Forth & Clyde Canal towpath is now shut at Stockingfield Junction for construction of a new bridge. Signed diversions have been put in place. In the opposite direction, the closure is at Ruchill Street. On the opposite bank, the path … [more]

Ashfield Street has been closed at Mansion Street, with concrete blocks across the road. There is just enough room between the blocks for a standard bicycle. This has been in place for a number of years now, and could be formalised into a … [more]

Ashfield Street has been closed at Mansion Street, with concrete blocks across the road. There is just enough room between the blocks for a standard bicycle. This has been in place for a number of years now, and could be formalised into a … [more]

A temporary bus stop deployed while the Great Western Road cycle lane is built. This was the only temporary bus stop sign I saw in use.

Please dismount for the freshly laid 10 metres of straight tarmac that has recently been laid. What is this pointlessness? @GoBikeGlasgow https://t.co/q8wMpCpnXE

Cycle lanes aren’t real lanes. https://t.co/QaqvxZPIyj

@GetGlesgaMoving @GlasgowCC @GoBikeGlasgow @policescotland Hope McDonald's being charged lane rental??! @CBTransport Where is alternative bus stop situated?? If there's room for a dedicated lane for Macdonald's drive thru, there's room for … [more]

The covered walkway at the SECC is temporarily closed, due to the use of the building as a temporary hospital.

This is more like it! 😊 shame it starts as randomly as it stops - how about more of this @GlasgowCC and some permanent barriers? Encourage healthy transport! πŸ˜πŸš΄β€β™€οΈ https://t.co/4J5XNGvche

Temporary protected bike lane for Metro Tunnel works on Swanston Street, Melbourne Location: Melbourne City Centre (Victoria, Australia)

Temporary road access to an industrial estate (created when its regular access was blocked by long-term utilities work) now blocked off.

Excellent signage at the Scottish Water work on the Kelvin Walkway Garriochmill Road access, where a short path has been laid to divert around the worksite.

Excellent signage at the Scottish Water work on the Garriochmill Road access to the Kelvin Walkway. A short path has been laid around the back of the work compound to maintain pedestrian and cycle access.

Cambridge station building looking splendid in the harsh winter light. Temporary bollards and threatening signage.

Hi @EastRenCouncil , could you arrange to have this traffic information sign repositioned so that it doesn't block the cycle lane for the next 6 weeks? Its current position is creating conflict between people cycling and buses/cars etc. … [more]

A new path has been provided around house-building works, but has been blocked by fallen security fences.

Temporary northbound closure of the North Hanover Street contraflow bus lane in connection with building works at Queen Street station. The official diversion is via North Frederick Street.

After the smooth new path from the Springburn Expressway footbridge is this mess!

Protected signs on path closed for Sighthill's redevelopment (the original Glasgow-Cumbernauld cycle route), and a reopened path to Baird Street.

Temporary signage for a long-term access restriction during Sighthill redevelopment.

Contractors still using the cycle lane for their temporary signs.

Haw @EastRenCouncil your bike lanes in the door zone are bad enough but this really is taking the piss! Move the sign please. https://t.co/6BHe6XluMf

Temporary diversion signs for both NCN1 and "leading to NCN1". But I thought this actually was NCN1.

Temporary cycle parking at Queen Street station, during its redevelopment, replacing the cycle parking in the former car park.

Access to cycle parking being maintained during station building works.

Cycling Around The Ashton Avenue Bridge Diversion

To indicate a minor road will be closed, half of NCR75 is closed off to cyclists and pedestrians. https://t.co/GbHTksrdce

A 'Watch Your Speed' sign in a pedestrian precinct, where there are already speed humps!

Cycle hire point and cycle parking stands removed to make way for temporary queuing arrangements at Queen Street station.

Temporary arrangements at what will become the entrance to a new housing estate.

Outstanding cycle lane blockage by @GlasgowCC. https://t.co/NTMCss9lFj

A temporary sign obstructing the shared-use footway.

Despite great steps to provide extra cycle parking during the folk festival (see #67642), demand is still outstripping need.

Despite great steps to provide extra cycle parking during the folk festival (see #67642), demand is still outstripping need.

Temporary notice (during the Cambridge Folk Festival) in St Thomas's Square advising: Please do not park in surrounding roads (\) Use the designated car parks

At last it looks like a really decent effort has been made to provide temporary cycle parking for the annual Folk Festival.

Just like last year, this event sign for motorists is blocking the cycle lane at Richmond Circus @RichmondCycling http://t.co/JJSrelf4pG

A road closure where cyclists and pedestrians have been exempted. The two plastic barriers are placed so cyclists can cycle around them.

After objections, the Fastlink busway carriageway over the Clyde Arc bridge will now permit cycling. But the plastic barriers at each end will only be removed once the buses are due to start running.

The temporary cycle lane that weaves around trees on Nelson Street being filmed by @madeinbristoltv http://t.co/evwbAq8muO http://www.bristolpost.co.uk/Reader-s-letter-Zigzag-Bristol-bike-lane-just/story-25815703-detail/story.html also … [more]

Street trial has been great! And some kids used the temporary cycle lane! @2wheels2work @Emma_DIYstreets @sustrans http://t.co/0LW1TFdJ4r

Towpath/NCN 754 @FalkirkWheel is ready for to be be diverted tmrw to allow railway works over winter @SustransScot http://t.co/6dfqNxuoJx

Temporary Path Around Railway Works. Path around temporary railway works. A short diversion, and not bad to use. How long will it be there? See clip at http://youtu.be/Om0qumHbp2o

A temporary sign that has not been placed on the cycleway.

See clip at http://youtu.be/IcVs06cJoDk This is just a dangerous facility that needs to have some kind of regular cleaning schedule.

Advanced notice of temporary cycle lane closure (aka Woodburn Way.) Cars still (afaik) able to proceed, which I find puzzling.

Construction of temporary bike racks on the New Museums site while building work is ongoing.

See clip at http://youtu.be/C8nOmhjLqrs After the http://www.youtube.com/watch?v=8bCxf9KgP8M clip, we've now moved onto this. Is Addenbrookes ripping out segregated route and replacing it with on road space? Or is this just a temporary … [more]

Temporary cycle parking provided for the Glasgow Centre for Population Health seminar 'Growing the evidence base that cycling is good for health and the economy' which took place on 21st May. There's no permanent cycle parking here. Photo … [more]

Temporary repair to motorway footbridge that was hit by an overheight vehicle! UPDATE June 2014: This footbridge is going to be replaced by an accessible ramped footbridge built adjacent to the existing structure.

CambridgeonIce. The change over last year is that the market will be "behind" the ice rink (north westerly), towards the town centre and the cycle parking has improved: "lock it or loose it" and there Sheffield type stands to lock to.

Signage for the BHF Oxford-Cambridge ride

This was a temporary cycle path while the hotel and tennis centre were under construction.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/temporary/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.