Donate using PayPal

Tags: temporarylights

You may also be interested in the automatic categorisation listings and themed galleries.

[Image taken 8.3.22] Bootham, York. No provision for people on cycles during the works. The non-compliant advisory cycle lane is reduced in width by the cone and the works sign. Other image here today: #179817 and links.

[Image taken 8.3.22] Bootham, York. Works underway for the Scarborough Bridge to Bootham Park cycle route improvements crossing. Context and ‘before’ images links: #177760. Other image here today: #179818. Other images today: #179819.

[Update: The works here have ended. The temporary lights have been removed. The lack of protection for people crossing remains. As do problems with surface water see also: #177113 and: #175427.] [Image taken 20.10.21] Leeman Road, Memorial … [more]

[Image taken 20.10.21] Leeman Road, Memorial Gardens, York. Pushing off when the light opposite has turned green and the signal is audible. There is no protection from pedestrians crossing ahead of the cyclist. There is no protection from … [more]

[Image taken 20.10.21] Leeman Road, Memorial Gardens, York. Activating the temporary cycle crossing. There are no road markings to tell drivers where to stop/to increase observance of the all traffic stopping lights and no markings to keep … [more]

[Image taken 20.10.21] Leeman Road, Memorial Gardens, York. Pedestrians must cross the cyclist exit and this is a very busy route to-from the rail station (see: #169506). It also floods: #169496, #169497. Context and links to other images … [more]

[Image taken 20.10.21] Leeman Road, Memorial Gardens, York. This is signage ahead of a temporary lit crossing over two lanes as part of the diversion for the Scarborough Bridge to Ouse Bridge Flood Scheme which was in place mid-May 21 to … [more]

[Image taken 31.8.21] Station Avenue, York. The narrow channel is the Leeman Road cycle contraflow. Context/explanation see: #173662 and links to other images taken today.

[Image taken 31.8.21] Station Avenue, York. This crossing is part of the Scarborough Bridge to Ouse Bridge Flood Scheme. An email on Friday confirmed the signage would be checked before the start of the Bank Holiday Weekend. Many signs … [more]

[Image taken 21.7.21] Heworth Green, York. The works here are to do with the development of The Gasworks (https://thegas.works/). The ‘Do not overtake cyclists’ sign on this side of the temporary lights is very visible. Other images today: … [more]

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/temporarylights/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.