Donate using PayPal

Tags: transpenninetrail

You may also be interested in the automatic categorisation listings and themed galleries.

The Trans Pennine Trail (NCN 62) now has a barrier-free tarmac surface between Knutsford Road and London Road.

View of the cantilever bridge crossing the Manchester Ship Canal from the Trans Pennine Trail (NCN62)

cyclist with ladder

Poorly designed link from the Trans Pennine Trail (NCN62) to Archer Avenue. A narrow cycleway leads to the pavement behind parked cars with no dropped kerb or means to access the carriageway.

A rare example of an access control barrier that is actually wide enough to ride through. Why it is there at all is another question as access to this stretch of the Transpennine Trail is open at other points.

Poorly designed access to the Trans Pennine Trail (NCN 62) from Westbrook Avenue. A narrow path leads from the pavement behind parked cars with no dropped kerb or means of getting from the carriageway.

Poorly designed access to the Trans Pennine Trail (NCN 62) from Clarke Avenue. A narrow path leads from the pavement behind parked cars with no dropped kerb or means of getting from the carriageway.

New tarmac surface on the Trans Pennine Trail.

Trans Pennine Trail (NCN62) has now been widened and surfaced between the London Road and Knutsford Road.

[Image taken 24.3.21] Lighting at Esplanade carpark, York. Part of a route (used by tourers on the Transpennine and NCN65) proposed as a diversion from the riverside which will close for the summer from 1 April 2021. See also: #166257, #166 ... [more]

[Image taken 24.3.21] Proposed access to the ped-cycle-wheelchair-accessible riverside at Esplanade car park, York, during temporary closure of the path. There's currently no destination signage, simply route branding. The bollards and post ... [more]

[Image taken 24.3.21] Esplanade car park, York. This signage is not visible to someone cycling through (it's at right angles). But it shows people are 'tolerated' not welcome here. There's nothing introducing the park (Memorial Gardens) - t ... [more]

[Image taken 24.3.21] The cycle symbols on the route out of Esplanade carpark, York, have worn away. There are two lots of 3.5cm untapered solid metal upstands across the full width of the route (part of flood prevention measures), height r ... [more]

[Image taken 24.3.21] Esplanade carpark, York. Part of a route proposed as a diversion from the riverside which will close for the summer from 1 April 2021. Even on a bright day, this does not look inviting or feel safe. There is nothing to ... [more]

[Image taken 24.3.21] Esplanade carpark, York. This is the uninviting and 'defensive' entrance to the proposed diversion for all users (including Transpennine Trail and NCN65 route riders) for around four months in 2021 while floodgates are ... [more]

[Image taken 24.3.21] In York, from April 2021, people riding the riverside route (including touring cyclists) will be diverted. The proposal is to take them through between the bollards/posts to the right. It is not currently signposted. I ... [more]

Update 2.5.21: See closure warning signs: #168189 and links. Update: 15.4.21. See: https://ea.sharefile.com/share/view/sb274c3a3992c46eca40459bfb069d215 for the map of the diversions that will be in operation while the floodgates are replac ... [more]

Covid-19 funding used to fund a very short stretch of this long needed improvement of this stretch of cycleway #52592 - (they didn't get as far as #84321) You would have thought that they would have cleared the vegetation while they were a ... [more]

A Sustrans volunteer engaged in graffiti removal on NCN67 in Leeds

"Welcome to Leeds" on NCN67 railway path approaching Methley Junction.

Tunnel under the M62 motorway

Advance warning sticker for NCN67's right turn from the A642 at Bottomboat.

Signs for the Trans Pennine Trail in Penistone, seen from the top of the ramp seen in #112596.

Ramp access to the Trans Pennine Trail in Penistone. Unfortunately, the signage appears not to have been moved from what appeared to be an older stepped access point to the end of the newer looking ramp. There is also stepped access to W ... [more]

Signage and an information board at an access point to the Trans Pennine Trail.

The Trans Pennine Trail at Penistone station.

Clear signage on the Trans Pennine Trail outside Penistone station.

A route sign for the Trans Pennine Trail. The red background for the NCN 6 number has faded out.

A route sign for the Trans Pennine Trail at Corporation Street.

The 'no through road' is also the Trans Pennine Trail.

Chicane barriers on the Transpennine trail NCN62. I suppose the idea is to slow down cyclists approaching the road, but this is entirely unnecessary as they are at the top of a steep ramp. The one positive is that they are a great improv ... [more]

Touring family from Germany gets stuck once they reach Warrington Borough Council's barriers :-( They made it to Liverpool with the help of locals however after visiting Ireland they used a van rather than the Trans-Pennine Trail to get ... [more]

TPT route sign

"A frame" barrier #84328 can now be avoided on the Transpennine Trail (NCN 62) UPDATE July 2019: The gate has been locked again

Pointless barrier #58753 now has a bypass. The track is still steep and poorly surfaced.

Tran Pennine Trail goes through a large muddy puddle through the bridge under the A56. UPDATE 2018 - this section now has a tarmac surface - though not particularly smooth.

Trans Pennine Trail route sign

Awkward barrier on the Trans Penine Trail (NCN 62)

Narrow rough surface on the Trans Pennine Trail (NCN62) UPDATE 2021: Now has a wider tarmac surface #167635

Trans Pennine Trail (NCN62) follows a quiet road along the south bank of the Mersey

route sign

At first glance the 6 Sheffield stands at the Heatly Co-op seem to be generous provision. However, on closer inspection these are minature stands (probably intended for childrens bikes) and there isn't room to fit a bike behind the parked c ... [more]

Cyclists Dismount sign

Devereux Cycles

Trans Pennine Trail (NCN62) crosses a busy A road at an acute angle with poor visibility and no protection whatsoever.

'A' frame obstructing the Trans Pennine Trail (NCN62)

Barrier obstructing the Trans Pennine Trail (NCN62)

'A' frame obstructing NCN62

'A' frame barier obstructing the Trans Pennine Trail (NCN62)

'A' frame barrier - can be avoided by lifting your bike over the horse step.

'A' frame obstruction

Chicane barriers are much too close together to ride through.

cycle parking at the ranger cabin at Statham

One of many barriers obstructing the Trans Pennine Trail (NCN62) as it passes Lymm.

'A' frame barrier obstructing the national cycle network. The horse barrier to the left is a bit easier.

Muddy section of the Trans Penine Trail - during dry weather.

Kissing gate replaced by an 'A' frame barrier. UPDATE 2018: The kissing gate has now been replace by chicanes.

sign for national cycle network - but no indication of destinations

Steps do not make ideal conditions for a signed cycle route.

A 500m long stretch of the Trans Pennine Trail with a decent tarmac surface - could do with cleaning as mud tends to accumulate in the cutting.

Extremely muddy section of the TransPennine Trail (NCN62). Photo was taken during dry weather.

Separate steps for pedestrians and ramp for cyclists. Shame about the surface quality.

Barrier obstructing the national cycle network

Direction sign

'A' Frame barrier

Poorly surfaced track with muddy patches.

A spot to have a rest on the steep climb up to the Trans Pennine Trail (NCN62)

'A' frame barrier

No direction sign where the Trans Pennine Trail (NCN62) leaves Bradshaw Lane.

Wheeling Ramp.

Route Signs

Trans Pennine Trail route signs - but which way is it to Liverpool?

Separate route for pedestrians and cyclists on this stretch of the Trans Pennine Trail

Tans Pennine Trail (NCN 62) is narrow, poorly surfaced and tends to form large puddles in this stretch (photo shot after a dry spell in summer).

Very tight 'A' frame barrier. It is in a dip so a large puddle tends to form after wet weather making wet feet inevitable.

Nasty, long pinch point on NCN 62

Cyclists Dismount

This is the national cycle nework - not a BMX track!

sign on the national cycle network

Trans Pennine Trail (NCN 62) follows an indirect, narrow & poorly surfaced diversion round the sewage works.

Cycle bridge. I'm not sure how the expense was justified being as how Barnard Street crosses a perfectly acceptable bridge imediately to the north.

Trans-Pennine Trail route sign

Trans-Pennine Trail sign at Knutsford Road swing bridge

'A' frame on the TPT

'A' frame barrier. Unusually, actually wide enough to fit the handlebars through. Plus a CYCLISTS DISMOUNT sign.

'A' frame barrier

barrier obstructing the Trans Pennine trail

Serious metalwork obstructing the Trans-Pennine Trail (NCN62). The kissing gate is intended for cyclists but it is easier to lift your bike over the low wooden horse entrance.

Trans-Pennine Trail (NCN62) heads through the narrow chicane barrier on the right. The alternative path to the left is slightly better surfaced, wider and free from obstruction.

'A' frame barrier obstructing the Trans-Pennine Trail (NCN62)

Reasonably passable chicane barrier

'A' frame can be avoided by a little path to the left UPDATE 2021: The barrier has been removed and the path widened and surfaced: #167660

This used to be a difficult barrier, but has been replaced with an 'A' frame, which can be avoided by riding through the open gate. UPDATE 2021: The barrier has been removed when the trail was recently surfaced: #167635

Diversion on Trans Pennine Trail - has been in place for quite a while. UPDATE 2021: Five years on the route has now been constructed. #167633

Barrier where two cycle routes (Trans-Pennine Trail NCN62 & Black Bear Park) cross the A49 at a toucan crossing. The pavement can get very crowded when even small groups try to thread themselves from the crossing through the barrier. The s ... [more]

Section of the Trans-Pennine Trail has been closed by site works for a few years.

Cycleway passes beneath Southport Pier

Cycleway along the sea wall

Cyclists meant to take overgrown route to the right

Route into Southport

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/transpenninetrail/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.