The end of the Burleigh Street contraflow cycle track currently under construction. The route to Water Row is via Pearce Street.

Roadworks in Burleigh Street to create a contraflow cycle track and repave the footways.

Exciting to spot Sauchiehall Street's new 'avenue' taking shape in Glasgow. πŸ‘€ πŸŽ‰ πŸšΆβ€β™€οΈπŸš²πŸŒ³πŸšŒπŸš™ πŸšΆβ€β™€οΈ Just couldn't help noticing the state of what appears to be the final cycle surface, in contrast to the ne ... [more]

The Partick Bus Station rebuild continues, but at least there will be a direct route onto the carriageway at Merkland Street once it's finished. The stone bases for the bus shelters were apparently imported all the way from Portugal! ... [more]

This appears to be a new path over to the Union Canal access ramp at #101130, but has old school barriers making cycle access difficult.

An update on #99502, double white lines have been added. Note the two on bikes on the footway across the other side of the road.

Car parking in the under construction cycle track in Archerhill Road, opposite the, erm, car parking layby.

Car parking on the under construction cycle track in Archerhill Road.

A new cycle route under construction on Dyke Road, leading to the BMX Centre at Knightswood Park. This was the last sign of work I saw heading down Dyke Road. Perhaps the footway will get widened. Update at #100297 and #101274.

A new cycle route under construction on Dyke Road, leading to the BMX Centre at Knightswood Park. I imagine this isn't finished.

A new cycle route under construction on Dyke Road, leading to the BMX Centre at Knightswood Park. A shared footway is going in here, and some education of the locals on the purpose of the shared footway appears to be necessary.

The BMX Centre under construction at Knightswood Park. Bigger than I thought.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. The entrance to the new BMX Centre, showing something close to a continuous footway across the entrance roadway.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. I think the cycleway is to be segregated from the road using orcas or similar.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. A staggered pedestrian crossing across the road (signalled) and cycleway (probably zebra). I think the cycleway is to be segregated w ... [more]

A new shared footway on Archerhill Road, leading to the BMX Centre at Knightswood Park. The route crosses sides here at this new toucan crossing. Maybe they'll put in some cycle parking for the shops before they are finished. Quite a sho ... [more]

Polmadie Bridge being rebuilt.

Progress on the South City Way protected cycle lane.

The South City Way already getting used, albeit in the wrong direction!

The new zebra and cycle parallel crossing on Govan Road has still not been completed! Note the parking layby is narrower than the vehicle parked in it.

The new zebra and cycle parallel crossing on Govan Road still hasn't been completed. Not even the shared footway surface has been finished!

Fabulous to see the progress with Glasgow's South City Way on my commute. Well rolled surface, low chamfered kerb = good pedal clearance to maximise width, generous angles and, of course, it will be uni-directional. #stepchange in street de ... [more]

smashin big new bike park going up at yer partick hub nxt to morrisinos β˜†activetravelcity @GoBikeGlasgow https://t.co/Xlaub559km

Slow progress on the parallel cycle/zebra crossing on Govan Road.

The northern footway of Govan Road is being rebuilt for shared use.

The northern footway of Govan Road being rebuilt for shared use, with some low branches coming over the wall from the park.

The plans show a parallel cycle/zebra crossing to go in here.

The new bridge over the railway line at Bredisholm Road is not finished.

A bus stop bypass being formed on Pollokshaws Road, to be part of the South City Way.

A new bus stop bypass being built in Devon Street.

Like the sign in #89462 said, the footway of the A725 at Bogs Brae is currently shut, but the new shared footway can be seen in the background under construction.

No cycling or walking in the new Raith Interchange underpass. Or at least I think that is what it is meant to mean. The shared footway hasn't been completed yet.

Despite the footway of the A89 not allowing cycling, and despite this crossing leading to nothing but a bus stop that does not have any bus services carrying bikes, a toucan crossing has been installed across Coatbridge Road. Does this come ... [more]

The path will continue further north, but the Wester Cleddens Road toucan crossing could be better aligned with the path.

A section of the A77 cycleway being resurfaced and widened. Several bike tyre tracks can be seen.

A section of the A77 cycleway that is being resurfaced, and has been left open for use in the meantime. Off to the left one of the crossing points can just be seen, where the dual carriageway can be crossed to access properties on the op ... [more]

A section of the A77 cycleway being upgraded. Unfortunately the newly installed lighting columns now obstruct the path. With some forward planning, they could have been placed nearer the fence, out of the way of the cycleway.

An upgraded section of the A77 cycleway. Unfortunately the newly installed lighting columns now obstruct the path. With some forward planning, they could have been placed nearer the fence, out of the way of the cycleway.

The new path alignment along the south bank of the Clyde, with a straight path under construction in place of previous path with steps. #84282 shows view from other end. Update of the completed path at #86787.

Former steps on south bank path now replaced with ramp, still with surfacing to come. #84383 shows view from other end. Updated view of completed path at #86785.

The stepped cycle lane on George V Bridge is for left turns only. Anyone going straight on should remain on the carriageway, in lane 3 or 4 (see #82973). Plenty of footway clutter to deal with on the corner.

New stepped cycleway on George V bridge. Far too narrow. Motorists passing far too close. Hellish. https://t.co/C2DajJpBYr

Working on better cycling access to the M8 underpass at Craigton Rd/Jura St #glasgowcycling https://t.co/iIvigzzCZd

Here's one of the better junctions, with direct diagonal cycle crossing. Lights not working yet. http://t.co/Va6YcUT1mz

Toby Way approaches Bath Bridge Roundabout

First section of the new Toby Way on Clarence Road Once the difficult crossing has been achieved, the way ahead looks clear.

(from #49693) ...it's not actually finished yet... (to #49695)

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/underconstruction/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.