Temporary closure of the path east of the Phoenix Road underpass for work on the crumbling motorway flyover. The Colleges Cycle Route is not affected at this stage.

[Image taken 6.9.21] Marygate car park, Railway Walk, Scarborough Bridge, Earlsborough Terrace, York. [Note: No streetview at this location] Diversion signs for the works to connect electricity for the EV charging bays at the far end of the ... [more]

The Sauchiehall Street cycleway is still closed for a short distance near Dalhousie Street. See also #172679.

Cycle parking stand relocated during works at Glasgow Science Centre, but mostly full of hire bikes.

Sauchiehall Street cycleway closed for works. No obvious attempt to sign a diversion route. See also #173268.

A path connecting Bearsden and Drumchapel has been kept open during the long-term water works in the area. However, the surface is not good for cycling on, and the other path nearby, from the western end of Annan Drive, would probably be a ... [more]

Access between Drumchapel and Bearsden has been maintained during the long-term water works. The surface of the temporary path is stones and not good for cycling on. However, the path south (to the right) has been closed since it goes throu ... [more]

The Garscadden Way and path to the Drumchapel Way is presently blocked by Scottish Water works, but the path to Annan Drive has been kept open. Conon Avenue has now reopened.

The resurfaced section of the Forth & Clyde Canal towpath will tie into the work at Stockingfield Junction, where a bridge is being built across the canal.

[Update. See: #164095 and: #169084] [Photo taken mid-May 2019] York Cycle Campaign [yorkcyclecampaign.bike] members leafletted and spoke to people on Terry Avenue and at the Butcher Terrace end of the Millennium Bridge. The message was, Ter ... [more]

Caption: [Image taken 26.2.21]. Despite the cyclists dismount sign there is a route through. So why the sign? See also: #164583, #164584, #164585, #164586. Newer images: #166495, #166496

[Image taken 26.2.21] Cyclists dismount sign on Micklegate, York, looking towards Micklegate Bar. See also: #164313, #164583, #164584, #164585, #164587. Newer images: #166495, #166496

[Image taken 26.2.21] Blossom Street, York looking towards Micklegate Bar shows a route through. On the other side however is a Cyclists Dismount & Use Footway Sign. See also: #164583, #164584, #164586, #164587. Newer images: #166495, #166 ... [more]

[Image taken 26.2.21] Blossom Street, York looking towards Micklegate Bar. No access to Micklegate on a cycle from Queen St/Blossom St. See also: #164583, #164585, #164586, #164587. Newer images: #166495, #166496

[Newer images: #166495, #166496] [Image taken 26.2.21] Queen Street junction with Blossom Street at Micklegate Bar, York. Cyclists have a green filter. (https://yorkcyclecampaign.bike/2019/07/20/micklegate-bar-lets-keep-it/) In March 2019 C ... [more]

[Image taken 25.2.21] A flooded New Walk, York. See also #164487, #164488

[Image taken 25.2.21] New Walk is on the opposite bank of the River Ouse to Terry Avenue. It was originally suggested as a viable alternative to it for the duration of the Clementhorpe flood defence works. However, the all-weather surface i ... [more]

[Image taken 25.2.21] Terry Avenue, York will not be accessible to people on cycles coming from Skeldergate until, 7 August 2022, or for as long as Clementhorpe flood defence works take. See also #164488, #164489. [Informal user count (Sund ... [more]

Update: Terry Ave closed for around a year on Monday 17 May 2021. York Cycle Campaign overview and cycle diversion info: https://yorkcyclecampaign.bike/2021/05/15/terry-avenue-closure-17th-may/ Environment Agency site (inexplicably the fro ... [more]

Excellent signage at the Scottish Water work on the Kelvin Walkway Garriochmill Road access, where a short path has been laid to divert around the worksite.

Excellent signage at the Scottish Water work on the Garriochmill Road access to the Kelvin Walkway. A short path has been laid around the back of the work compound to maintain pedestrian and cycle access.

This fencing has been obstructing the access to the Sighthill motorway foot and cycle bridge for some time, even though the bridge is for now still open. The fencing appears to be being used to create nothing more than a contractor's parkin ... [more]

The road bridge across the A878 connecting the park next to the Erskine Bridge to Mount Pleasant Drive. The path around the northern part of this area is presently closed while works are being undertaken.

Aaaand once again @GlasgowCC have allowed the shared path from Pollokshaws to Silverburn beside Barrhead Road to be blocked by works. @PersimmonHomes do you realise this route is for cyclists too and that many bikes are a lot wider than tha ... [more]

Bridge maintenance work on the Snow Bridge. See also #100430.

Bridge maintenance work at the Snow Bridge. See also #100431.

Temporary northbound closure of the North Hanover Street contraflow bus lane in connection with building works at Queen Street station. The official diversion is via North Frederick Street.

A blind corner risk on the new Summertown Road shared footway. Note that the position of the dropped kerb discourages cycling away from the wall and towards the kerbline where there is better visibility.

Building works at Partick Bus Station have meant that the point where cyclists join Merkland St carriageway has now been closed, and cyclists are forced to share a narrow footway already obstructed by (unrelated) scaffolding. However, t ... [more]

Building work has now started at Partick Bus Station, resulting in railings being put across the point where it was easy to join the roadway in Merkland Street (see also #94587). Work is to last 9 months. http://www.spt.co.uk/2017/09/red ... [more]

Rogerfield Road appears to have been commandeered for the motorway widening project. Another loss for active travel. Does Core Path status actually mean anything?

Access maintained for pedestrians and cyclists during bridge works. Narrow but way better than a lengthy diversion.

Access to cycle parking being maintained during station building works.

The underpass and cycle route are closed due to building works at the shopping mall.

Building works at the shopping mall have shut the cycle route.

Although still accessible, the new cycle parking at Kelvinbridge station is surrounded by building contractor's skips, hoardings and containers, making it rather unwelcoming.

Temporary Path Around Railway Works. Path around temporary railway works. A short diversion, and not bad to use. How long will it be there? See clip at http://youtu.be/Om0qumHbp2o

The cycle track that by-passes the roundabout on Nithsdale Road has been blocked for some months by this compound. No diversion signed, or warning of any kind coming from the opposite direction.

Resurfacing of a cycle path. This path is 4 m wide and four kilometres long without interruption, providing part of a fast cycle route around Assen. The new surface is several inches of asphalt laid on top of proper foundations. The same ma ... [more]

The Bicycle Works, on Agyle Place, possibly the best place in Scotland for having you bike repaired.

Barringtom cement works from Barrington Hill

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photomap/tags/works/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.