Donate using PayPal

All photos

Showing items 1 to 100 from total of 103,583 items. Ordered by caption descending.

Photo # Photo Caption Icon Categorisation
103458Photo #103458🚲
Use
sidewalk
when bus
in stop

🚲
Yield
to
peds
Cycleway:
Infrastructure
cycleways
102984Photo #102984⛔️ no exceptionsRoad environment:
Problem
road
73107Photo #73107Zwischenahner Meer cycle route near Rostrup.

Location: , Meyerhausen (Lower Saxony, Germany)
Cycleway:
Good practice
cycleways
30563Photo #30563Zwei auf einem Rad. Seven months pregnant.Other:
Event
general
43293Photo #43293Zúžení u Modřanského nádraží

Stezka je příliš úzká. Však je podél ní vyšlapaná pěšinka. Rozšíření by bylo velmi žádoucí.
Other:
Problem
general
43292Photo #43292Zúžení u Modřanského nádraží

Stezka je příliš úzká. I podél ní je vyšlapaná pěšinka. Rozšíření by bylo velmi žádoucí.
Other:
Problem
general
43295Photo #43295Zúžení u Karlova mostu

Kolo se tudy v podstatě dá jen vést.
Other:
Problem
general
43296Photo #43296Zúžení stezky na Štvanici

Pár sloupů přímo uprostřed stezky.
Other:
Problem
general
43297Photo #43297Zúžení stezky na Štvanici

Pár sloupů přímo uprostřed stezky.
Other:
Problem
general
37964Photo #37964Zoomed-in view south from Mill Road Bridge's eastern side towards Carter Bridge. It has a ready made track, suitable for the Chisholm Trail. For a view of the western track see >> #37961<<.Other:
Infrastructure
general
37611Photo #37611Zoomed view from Coldhams Lane bridge to Barnwell Junction, with the grey metal structure of ramblers bridge in the background. The end of Coldhams Road to the right and the end of Henley Road with the backside of the DSG Comet / PC World shop on the left. See Coldhams Lane bridge arches to the east of the tracks >> #37461<<.Other:
Infrastructure
general
18427Photo #18427Zoom in for the larger version. Red circles have been added.

Plan from Tesco's consultants showing that they intend to make deliveries from the front of the store, i.e. from Mill Road.

This plan was circulated at the Cambridge City Council licensing meeting on 17th August 2009.
Enforcement:
Problem
enforcement
88006Photo #88006Zon Motosikal - motorbike (not cycle) ASL, Kuala Lumpur.Road environment:
Infrastructure
road
43466Photo #43466Značená trasa A41 zde odbočuje.Road environment:
Misc
road
43387Photo #43387Značená cyklotrasa 11 zde kříží zkratku od Košíku pokračující strmým spoutpáním ke hradišti.Road environment:
Misc
road
43285Photo #43285Zličín (*)

Mělká. Pevné schody z nástupiště do vestibulu na úrovni chodníku. Výtah od perónu k vestibulu je příliš malý.
Other:
Misc
general
90947Photo #90947Zlarin, Croatia - bike parking by a cycling route round the car-free island.Cycle parking:
Infrastructure
cycleparking
43283Photo #43283Zkratka z Bělohorské

Jediná spojka Bělohorské dolů do ulice Pod Marjánkou beze schodů široko daleko.
Road environment:
Misc
road
43350Photo #43350Zkratka parčíkem

A1 na výjezdu z Kosárkova nábřeží na Klárov.
Road environment:
Misc
road
43498Photo #43498Zkratka na A22 směrem k lesu.Road environment:
Misc
road
43284Photo #43284Zkratka na A2

Vyježděná pěšinka se napojuje na slepou ulici ústící na Rohanské nábřeží.
Road environment:
Misc
road
42802Photo #42802Zkratka Kyjemi

Alternativka k A25, zkracuje průjezd starými Kyjemi a ubírá jedny schody. Lednická ulice a pak pěšina za tratí. Trasu zaslal Ivo Petrouš.
Road environment:
Misc
road
43361Photo #43361Zkratka Dobrovského

Odbočení z Ovenecké do Dobrovského zkrátí na trase 2 cestu do Letenských sadů.
Road environment:
Misc
road
43542Photo #43542Zkratka A23 - odbočení z centra

Strmému stoupání ulice K Jezeru na trase A23 se dá vyhnout odbočkou vlevo ke hrázi Hostivařské přehrady.
Road environment:
Misc
road
86886Photo #86886Zizzi using bicycles for advertisingBicycle:
Good practice
bicycles
43282Photo #43282Žitnou dolů

Průjezd Žitnou je nepříjemný, vyžaduje řazení do druhého pruhu, ale je při pokročilých schopnostech možný. Tady nám pomáhá kopec dolů.
Road environment:
Misc
road
28216Photo #28216Zigzags painted. Location might not be correct.Road environment:
Infrastructure
road
109214Photo #109214Zigzag ramp from Penicuik Drive down to Myreside Drive. Another useful path added to new estate. Also, helps avoid Shettleston Road.Cycleway:
Infrastructure
cycleways
60893Photo #60893Zigzag cycle stands taken out and FOLDED up (see #60894), to make space for the city centre fair. This should be easier to install and remove and less likely to flip over. These stands are bespoke for the City of Oldenburg: © "Stadt Oldenburg, Oliver Reiners" and are ideal to separate an area of slower traffic (pedestrians) from faster moving traffic, see #50083. Another zigzag parking stand #11381.Cycle parking:
Good practice
cycleparking
60894Photo #60894Zigzag cycle stands taken out and FOLDED up (see #60894), to make space for the annual city centre fair. This should be easier to install and remove and less likely to flip over. These stands are bespoke for the City of Oldenburg: © "Stadt Oldenburg, Oliver Reiners" and are ideal to separate an area of slower traffic (pedestrians) from faster moving traffic, see #50083.Cycle parking:
Event
cycleparking
60895Photo #60895Zigzag cycle stands taken out and FOLDED up (see #60894), to make space for the annual city centre fair. This should be easier to install and remove and less likely to flip over. These stands are bespoke for the City of Oldenburg: © "Stadt Oldenburg, Oliver Reiners" and are ideal to separate an area of slower traffic (pedestrians) from faster moving traffic, see #50083.Cycle parking:
Infrastructure
cycleparking
11381Photo #11381Zigzag cycle stand. This should be easier to install and remove and less likely to flip over. These stands are bespoke for the City of Oldenburg: © "Stadt Oldenburg, Oliver Reiners" and are ideal to separate an area of slower traffic (pedestrians) from faster moving traffic, see #50083. Another zigzag parking stand #39218.Cycle parking:
Infrastructure
cycleparking
11501Photo #11501Zigazg cycle lane between pinchpoints is 1.5 m wide. Reduced width red tarmac at George Street and 1.2 m up to Chesterton Hall Crescent. But cyclists can't do 80 degrees bends...Cycleway:
Infrastructure
cycleways
100476Photo #100476Zig-zag start of towpath along the Calder and Hebble Navigation.Cycleway:
Infrastructure
cycleways
100477Photo #100477Zig-zag start of towpath along the Calder and Hebble Navigation.Route sign:
Infrastructure
routesigns
56492Photo #56492Zig-zag ramps between the two levels on the University's West Cambridge site.Cycleway:
Good practice
cycleways
24842Photo #24842Zig-zag path leading up to the end of the Coullée Verte cycle route, on a former railway route.Cycleway:
Infrastructure
cycleways
106963Photo #106963Zig-zag cycle route to start of shared-use footway, St AndrewsCycleway:
Infrastructure
cycleways
32534Photo #32534Zig-zag cycle path down to the lower town, Locarno, SwitzerlandCycleway:
Infrastructure
cycleways
90757Photo #90757zig zag ramp avoiding stepsCycleway:
Infrastructure
cycleways
104053Photo #104053Zero maintenance here has caused the path to become completely overgrown.Obstruction:
Problem
obstructions
67451Photo #67451Zero G Bike and Board shop (with another branch across the road) - Chamonix is full of bike shops.Bike shop:
Infrastructure
bikeshops
97055Photo #97055Zero drainage on this section of the "National Cycle Network", otherwise known as the "local boating network"Obstruction:
Problem
obstructions
10888Photo #10888Zero cycle parking provided by the Council (compared to relatively plentiful car parking) in York Street, so bikes have to be parked insecurely on the pavement, causing blockages in some cases.Cycle parking:
Problem
cycleparking
10889Photo #10889Zero cycle parking provided by the Council (compared to relatively plentiful car parking) in York Street, so bikes have to be parked insecurely on the pavement, causing blockages in some cases.Cycle parking:
Problem
cycleparking
43748Photo #43748Zennor

A journey on an open top double decker bus from Sennen Cove to St. Ives.
Road environment:
Infrastructure
road
42955Photo #42955Želivského

Pohled z centra po Vinohradské.
Other:
Problem
general
19177Photo #19177Zebra crossings over Park Farm Road.Road environment:
Infrastructure
road
82449Photo #82449Zebra crossing where NCN route 1 turns inland from the Thames BarrierRoute sign:
Infrastructure
routesigns
29960Photo #29960Zebra crossing to riverside cycle route.Cycleway:
Infrastructure
cycleways
20857Photo #20857Zebra crossing to Albion Avenue Rec - cycling permitted with pedestrian priority.Cycleway:
Infrastructure
cycleways
90944Photo #90944zebra crossing south towards Bracknell High Street along the NCN422 route

Location: , Bracknell (England, United Kingdom)
Roadworks:
Infrastructure
roadworks
105097Photo #105097Zebra crossing on the F4 express cycle route alongside the railwayCycleway:
Infrastructure
cycleways
100772Photo #100772Zebra crossing on route to Tesco, BeverleyCycleway:
Infrastructure
cycleways
3814Photo #3814Zebra crossing on Emmanuel Road.Road environment:
Infrastructure
road
54130Photo #54130Zebra crossing of Church Road, Teversham, pavement cycleway on the right to Cambridge.Cycleway:
Infrastructure
cycleways
64884Photo #64884Zebra crossing of Bluebell Road also used by cycles.Road environment:
Infrastructure
road
45443Photo #45443Zebra crossing linking directly to cut-throughCycleway:
Infrastructure
cycleways
93679Photo #93679Zebra crossing leading to segregated cycleway in the suburbs of Tamsui.Cycleway:
Infrastructure
cycleways
61528Photo #61528Zebra crossing leading to huge new housing development in LongstantonRoad environment:
Infrastructure
road
12484Photo #12484Zebra crossing from Longstanton Rec to pedestrian and probably cycle route into new development.Cycleway:
Infrastructure
cycleways
54673Photo #54673Zebra crossing from cycle track towards Dol-de-Bretagne station - by the road, or a flight of steps to the rightRoad environment:
Infrastructure
road
36239Photo #36239Zebra crossing between the main pedestrian street and the start of the seafront cycle route south from central Iquique, Chile - needs improving.Cycleway:
Problem
cycleways
36242Photo #36242Zebra crossing between the main pedestrian street and the start of the seafront cycle route south from central Iquique, Chile - needs improving.Cycleway:
Problem
cycleways
65972Photo #65972Zebra crossing and dropped kerb leading to cycle/pedestrian bridge, BurgosCycleway:
Infrastructure
cycleways
25104Photo #25104Zebra crossing and cycle crossing in Bordeaux.Cycleway:
Infrastructure
cycleways
101059Photo #101059Zebra crossing (Cyclists Dismount) on NCN route 164 entering BeverleyCycleway:
Infrastructure
cycleways
94333Photo #94333Zebra bikeBicycle:
Good practice
bicycles
82359Photo #82359Zebra and parallel cycle crossing on London's first Quietway, from Waterloo to Greenwich.Road environment:
Infrastructure
road
43276Photo #43276Zborovská x Matoušova

Zborovská ve směru z centra. Ještě před dvěma bloky sjízdná s cyklopruhem a jedením pruhem pro auta. Nyní víc a víc ztrácí lidské měřítko a stává se rychlou nepříjemnou výpadovkou.
Other:
Problem
general
42969Photo #42969Zatočené stoupání po rampě u trubky metra.Road environment:
Misc
road
43281Photo #43281Zaslepení jen pro auta

Mezi patníky pro auta jde bez problémů na kole projet.
Road environment:
Misc
road
43275Photo #43275Žalanského

Žalanského u hřbitova v Řepích.
Road environment:
Misc
road
43274Photo #43274Zakázaný průjezd křižovatkou

I povrchovou částí mimoúrovňové křižovatky Patočkovou ulicí nelze projet legálně na kole. Cesta vede bočními uličkami a po chodnících.
Other:
Problem
general
42872Photo #42872Zákaz jízdy přes hradní nádvoří

V areálu Pražského hradu není dovoleno projíždět na kole. Mimoto je zde přes den velká frekvence chodců.
Other:
Problem
general
43160Photo #43160Zahrazená Sokolovská

Sokolovská již není hlavní ulice. Je tu zcela zbytečně zahrazena pro všechny. Podél invalidovny tedy nelegálně opatrně po chodníku či tramvajovém pásu.
Road environment:
Misc
road
53277Photo #53277Zaha Hadid's extension to the Serpentine Gallery.Destination:
Good practice
destinations
14342Photo #14342Zagreb - cyclists on the main pedestrian street, lined with bar terraces.Bicycle:
Misc
bicycles
42791Photo #42791Začátek zcyklostezkovaného úseku A41

Začátek chodníkové cyklostezky A41 v úseku Spořilov - Kačerov, zprovozněné v červnu 2012.
Road environment:
Misc
road
43382Photo #43382Začátek ulice K Jezeru. Na vjezdu zvýšený obrubník.Road environment:
Misc
road
43278Photo #43278Začátek stezky Zbraslav

Začátek pražské povltavské cyklomagistrály.
Road environment:
Misc
road
43348Photo #43348Začátek parku Kampa

Začátek parku Kampa. Rychlostní omezení na 10 km/h platí i pro cyklisty!
Road environment:
Misc
road
43273Photo #43273Začátek náplavky

Odbočka na kolmé trasy na Smíchov a do Vršovic, A2 vede rovně po nábřeží do centra.
Road environment:
Misc
road
43272Photo #43272Začátek magistrály

Magistrála je v některých svých úsecích zkratkou pro otrlejší. Na jihu města začíná legální úsek pro cyklisty nájezdem u ulice Na Strži. V úseku odsud po Nuselský most však nemá smysl magistrálu využívat. Jiné je to v často přes den ucpané Legerově ulici ve směru k IPP či věčně ucpaný úsek od Těšnova k Muzeu. I v opačném směru od Bulhara k Těšnovu je most přes Masaryčku dobrou zkratkou.
Road environment:
Misc
road
43389Photo #43389Začátek lesoparku, U Břehu

11: Začátek ulice U Břehu
Road environment:
Misc
road
43271Photo #43271Začátek Divadelní

A2: Směr do centra pokračujre ulicí Divadelní, pro odbočení na Národní pokračujte podél tramvaje.
Road environment:
Misc
road
43518Photo #43518Začátek cyklostezky

Jednosměrná cyklostezka v Ovenecké ulici.
Road environment:
Misc
road
42837Photo #42837Začátek cyklopruhu Tupolevova

Cyklopruh začíná za kruhovým objezdem. Auta zprava vám mají dát přednost.
Road environment:
Misc
road
42834Photo #42834Začátek cyklopruhu Hořejší nábřeží

Začátek cyklopruhu. S přerušeními vede až na Janáčkovo nábřeží k mostu Legií.
Road environment:
Misc
road
43304Photo #43304Začátek buspruhu

Začíná tu několik kilometrů dlouhý pruh pro autobusy a cyklisty k Andělu.
Road environment:
Misc
road
43467Photo #43467Zabočení do podchodu

Ostré zabočení do podchodu pod ulici Mírového Hnutí
Road environment:
Misc
road
43405Photo #43405Z36: Silnice Národních Hrdinů. Přikázaná 30 se zde obecně nedodržuje.Road environment:
Misc
road
43338Photo #43338Z05 na Jiráskův most překoná jeden přechod a odbočí vpravo, X030 směrem na jih přejede oba přechody a klesá také vpravo.Road environment:
Misc
road
43455Photo #43455Z Neveklovské vlevo do U Nových domů III.Road environment:
Misc
road
43392Photo #43392Z louky podél Botiče vede 11 ulicí U Břehu, A430 do kopce do ulice U Potoka.Road environment:
Misc
road
91731Photo #91731YY10 FOF Driving at me on my side & shouting to get over.
see youtu.be/kqowA90meWE
Enforcement:
Infrastructure
enforcement
17716Photo #17716YX56 EOM: Driving riding the morning papers whilst blocking the cycle lane on Grange RdEnforcement:
Problem
enforcement
17606Photo #17606YX51 CZT and others blocking cycle lane in front of St John's College SchoolEnforcement:
Problem
enforcement
40301Photo #40301Yup, Greenwich's one-way system around the market is a nightmare for both cyclists and pedestrians and is completely at odds with the otherwise very tourist/people friendly vibe that this area promotes.Dutch-style cycleway:
Problem
dutchcycleways
30004Photo #30004Yuba Mundo with room for 3 - homemade stoker seatBicycle:
Good practice
bicycles

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photos/all/caption/desc/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.