Donate using PayPal

Photo listing : temporary closures (infrastructure)

The most recent photos are listed first. See also photomap view.

Red light on Tower Bridge - 5 minutes for a ship to pass through, and for lots of cyclists to gather at the front of the queue.

Closed cycle route, Brugge (Bruges)

Work of some sort happening on the piers of the former Polmadie Bridge, with the Clyde Walkway remaining open.

Work of some sort happening on the piers of the former Polmadie Bridge.

The as yet unopened cycleway beneath the Bredisholm Road bridge, next to the M8 motorway. The path appears to be routed around a SUDS pond, after which it rejoins a position adjacent to the motorway. Not sure a road would be designed like t ... [more]

The as yet unopened cycleway beneath the Bredisholm Road bridge, next to the M8 motorway. Note that the signs at the junction with Brediholm Road are for destinations requiring a sharp turn and no destination is given for straight ahead.

High tide flooding.

Icknield Way diverted by Magnox Location: England, United Kingdom

Cautiously encouraged to see the path getting attention at last. This shows most of the section that's being dealt with. See also #87264

Cautiously encouraged to see this path finally getting some attention. I'm assuming this is not the final surface to be put on this path and that it will match the rest of the foot/cycle path.

White-on-Red enforcement sign for the traffic order in #80694 which prohibits cycling westwards past the Westgate Shopping Centre redevelopment.

Scooters passing road closure, Firenze

Cyclist passing road closure, Firenze

New Cufaude Lane and Amport Road from old Cufaude Lane Greenway Location: , Basingstoke and Deane Borough (England, United Kingdom)

Signage at The Tins path, during temporary closure at Kathleen Elliott Way for reconstruction.

The Tins path closed at Kathleen Elliott Way for reconstruction.

Temporary closure of The Tins path at Kathleen Elliott Way for reconstruction.

Temporary closure of The Tins path near Katherine Elliott Way for reconstruction

Elbe Ferry to Werben Ferry services available weekdays from 6am to 9:30pm. On Saturdays starting from 7am, on Sundays and bank holidays from 8am. Location: , Toeppel (Saxony-Anhalt, Germany)

Construction work on Santander's waterfront cycle route

Manchester Stretford Temp closure of Gorse Hill section of Bridgewater Way towpath used by pedestrians and cyclists. A signed diversion is hoped for. Can't find the plan on the web site bridgewatercanal.co.uk ! Closed Monday 8th September 2 ... [more]

Mill Road closed to through motor traffic on the day of the Tour de France.

An hour and a half after the Tour de France has passed through.

Ferry Lane, Shepperton, closed by the January 2014 Thames floods

Cycle track closed beneath Colwyn Bay pier - to be demolished, as repairs are too expensive

Cycle lanes closed for the Royal Parks Half Marathon - it's probably no great imposition to use the road on a Sunday

This signposted route has been closed. Behind the barrier is a great rubble pile from a demolished tower block, so evidently the route has been and will be closed for some time. No alternative route is posted, but you can get to the bri ... [more]

University farm being demolished.

Temporary closure of route 62

Tape used to close off the main street of La Pedrera on summer evenings

Private road, closed at night, near York station

Correct signage at sewer works - a very short distance to push a bike

The Kielder Lakeside South Shore trail crossing the Lewisburn bridge to the right, and the Reivers Way heading over the top to Cumbria to the left.

New anti-climb fencing being installed on Erskine Bridge. Cycle track on opposite side has become two-way temporarily while work is being undertaken.

Victoria Road closed to all traffic (other than pedestrians / dismounted cyclists) - during some emergency water works. Has been closed for several weeks making this road much nicer.

While work is carried out creating new cycle ways (see #25372 and #25373) at the end of Ypres Road, it is blocked off. However the other side of the works cycle network exists and there should be a diversion in place for cyclists to get to ... [more]

Looking through the barrier to see the progress widening the New Bit cycle/footpath.

This shows how the second cattle grid is being put in at New Bit.

While new cycle ways are under construction (see #25372 and #25373) cyclists have to work out their own diversion route.

Cycle track closed for maintenance/improvement west of Girona

Luard Road closed for installation of speed humps.

Rising bollards being repaired again after yet another idiot driver decided to ignore all the warning signs.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photos/closure/other/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.