Tandem puncture almost at the meridian on the busway near Swavesey. See #182506 for a short clip of the air leaking out!
Construction of the rebuilt modal filter at North Woodside Road is nearly complete. The road and pedestrian traffic signals have been brought into use, but the cycle signals are still bagged up.
Tweet of video of a motor vehicle blocking the cycle lane, rider struggles to get past as lorry passes on the road. https://twitter.com/Petercl04558275/status/1514642938017587204?s=20&t=jSAY_WEEZBPDZbM56oYSRQ
[UPDATE: #180733] [Image taken 24.3.22] Haxby Cycleway, New Earswick, Huntington/Haxby/York. [Note: No street view at this location.] Context: #180362. Both racks removed again. One visibly discarded. Where’s the other? Who is taking them ... [more]
A section of the Cambridge busway is set to close next week due to safety concerns. I’ve come to check out what it’s all about. Read all about it in next Tuesday’s blog. https://t.co/SdaRu2K4Rt
We were under the impression that guided buses weren't running on the northbound track pending a safety review - at least this one was moving pretty slowly. [It seems that, rather than immediate closure as you might expect, it was due to ... [more]
Jim Chisholm showing friends the new bridge on 'his' trail. [The wooden railings are temporary, it seems - www.cambridgeindependent.co.uk/news/temporary-safety-rail-on-the-7m-abbey-chesterton-bridge-ch-9236442 ]
The Benalder Street/Argyle Street crossing still awaits commissioning, and signage for former car parking spaces awaits removal. New works have started on the Snow Bridge across the junction, making access trickier.
[Image taken 17.11.21] Monks Cross retail park, Monks Cross, Huntington, York. [NOTE: streetview shows the previous site layout.] You could be forgiven that these items had not yet been invented when you visit by cycle so often is the marke ... [more]
The temporary segregation at the south end of Kelvin Way has temporarily been removed for COP26, and although the fences have now been removed from around the Kelvingrove Art Gallery, the segregation has not yet been replaced. The 'Road Clo ... [more]
Route 62 getting resurfaced. Location: Worsbrough Bridge, Barnsley (England, UK) This work will complete later in November 2021.
Link to video in which a bus cuts in front of cyclist Jeremy Vine as it comes to a stop: https://twitter.com/thejeremyvine/status/1455863859273687040
This footway is significantly busier than when the area to the left was a scrapyard and not student accommodation. But the COP26 diversion route has been signed over this regardless.
Narrow redesignated footway on expressway sliproad, with added fencing. When the fencing was installed, it blocked a dropped kerb at the toucan crossing ahead, but this had been resolved by the time I was there.
#CamRideHome at the redeveloped Robin Hood junction discussing the changes. Overall conclusion: a slight improvement for cycling over what was there previously. Main improvement is the High Street approach has been reduced to one lane.
Car driven along Blackweir cycleway https://www.bbc.co.uk/news/uk-wales-58662042 Also page about cycling in Cardiff: https://en.m.wikipedia.org/wiki/Cycling_in_Cardiff
Still no raised crossing or dropped kerb to join the Benalder Street cycle track, which otherwise appears nearly complete, apart from the lamppost. UPDATE: These issues have now been resolved, see #175144.
The Benalder Street cycle track ends at the Castle Street junction. It is not obvious what is to happen here.
Two-way pop-up cycle lane on Royston Road. The previous with-flow lanes have been removed, the centre line repositioned, and one side of the road reallocated for the protected cycle lane.
Two-way pop-up cycle lane on Royston Road. The red areas across the road are the remains of the old with-flow cycle lanes.
The pop-up two-way cycle lane on Royston Road. approaching the Broomfield Road junction. The cycle signals are on green during both general traffic phases, so any turns from the cycleway are not protected.
The pop-up two-way cycle lane on Royston Road approaching the Broomfield Road junction. Note that the cycle traffic signals are green at the same time as traffic is exiting Broomfield Road. The cycle lights were green during both general tr ... [more]
The pop-up two-way cycleway, which only just began back at the Provanmill Road junction, ends, and gestures for cyclists to go onto the footway at the motorway bridge.
The end of the pop-up two-way cycle lane on Royston Road. The cycle route continues around the corner to the right.
[Image taken 3.6.21] York. Buttercups and clover alongside NCN65 between Rawcliffe Bar Country Park and Homestead Park. (No streetview location.) I can't recall seeing fields of buttercups like these in previous years. Stunning. Today see a ... [more]
[Image taken 1.6.21] Marygate car park, York. Branding has been added to the hoardings. Other related images from today: solar powered lighting over notices: #169879; footpath diversion map with QR code: #169880; supply of diversion maps: # ... [more]
The path from Prospecthill Circus to Polmadie Road is being rebuilt. This end is pretty much complete.
The pop-up cycle lane on Braidcraft Road ends just short of the roundabout at Corkerhill Road. NCN7 and NCN75 join from the left after the roundabout but no connection has been made.
A pop-up protected cycle lane being finished off on Braidcraft Road, on what is a very high capacity road for such a low car ownership area.
The Brockburn Road pop-up cycle lane. The ramps at the start of the bus boarders cause quite a jolt and could have been made a bit smoother. Again, Guidance Path tactile paving has been used. Contrary to the fuss being made in the press ... [more]
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction. The cycle track ends at the Renfrew Street junction at a low-level cycle traffic signa ... [more]
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction. The cycle track is continous and marked well across the Hill Street junction.
The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction. Here the old painted track across the footway from the underpass meets the new track, ... [more]
The South City Way taking shape at the transition between two-way and one-way cycle tracks at the north end of Pollokshaws Road. I'm not convinced the layout will be used as the designer intended. Surprisingly, no use has been made of th ... [more]
[Image taken 24.3.21] Lighting at Esplanade carpark, York. Part of a route (used by tourers on the Transpennine and NCN65) proposed as a diversion from the riverside which will close for the summer from 1 April 2021. See also: #166257, #166 ... [more]
Pop-up cycle lane on Great Western Road, at bus stop near Balvie Avenue. The tactiles are of the lesser-spotted Guidance Path type, in a rubber stuck-down form. I think the pipe might be the drainage.
Having coffee at Southbank. I can see 8 @VictoriaPolice waiting to send cyclists who ride over 10 km/h to the Magistrates Court. Not very friendly. Maybe they know they’re damaging their brand. @cityofmelbourne just provide a safe ... [more]
Temporary end of the route from Darwin Green to Histon Road - except for the narrow footpath behind the camera.
Temporary end of the route from Darwin Green to Histon Road - except for the narrow footpath to the right.
The dangerous section of the guided busway in #Trumpington near #Cambridge station https://t.co/eTo823uYt0 Bridge strike
Cycleway between Alconbury and Brampton. The photo shows the end of the cycleway at the Brampton end, near a housing estate which is under construction (Oct 2020), and still several hundred metres from the nearest road. From here unsurfa ... [more]
Cycleway between Alconbury and Brampton. This is a pegasus crossing across the southern side of the Brampton Hut roundabout. When the photo was taken (Oct 2020) the crossing had not been completed and was not in operation. More photo ... [more]
Cycleway between Alconbury and Brampton. More photos: https://www.cyclestreets.net/location/152293-152324/ When the photo was taken (Oct 2020) this cycleway was blocked by fencing (see photo) just north of the Brampton Hut roundabout, ... [more]
Cycleway between Alconbury and Brampton. More photos: https://www.cyclestreets.net/location/152293-152324/ When the photo was taken (Oct 2020) this cycleway was blocked by fencing (see photo) just north of the Brampton Hut roundabout, ... [more]
The pop-up cycle lane on Dumbreck Road only goes as far as the M77 off-ramp, due to some motorists complaining to a councillor. The section from here to Mosspark Boulevard was removed. A permanent solution to the distribution of roadspac ... [more]
To the left, the Haarlem-Amsterdam cycleway is closed for roadworks - the deviation is across this bridge and left on the other bank of the canal.
Flowers at the site on the busway two years on from a fatal crash: see #102153 Messages from colleagues, family and friends.
The pop-up cycle lane in Bilsland Drive at a bus stop. The drainage would need to be sorted if this was made permanent.
The pop-up cycle lane in Bilsland Drive at a pedestrian crossing. Maybe not ideal, but something that can be sorted later, should the facility become permanent.
Really enjoyed Millburn Road segregated bike lane yesterday - still a bit of work to do done on signage but great, great start. Cars drive a lot slower and nearer 30mph speed limit when down to one lane. The bridge/Castle St next? 👏👏 ... [more]