Photo listing : roadworks (event)

The most recent photos are listed first. See also photomap view.

The Old Dumbarton Road cycleway still awaits completion of utility works before it can be completed itself.

The Old Dumbarton Road cycleway is still awaiting completion of utility works before it can be completed itself.

Construction work continues at Stockingfield Junction.

[Image taken 14.4.22] Mill Lane, York. The temporary traffic restriction order. Other images today this subject: #181690 and links.

The mural #33333 shining through the demolition of Park Street cycle park.

Cycle Lane Suspended, because where else are you going to put the temporary traffic lights?

[Image taken 8.3.22] Bootham, York. Works underway for the Scarborough Bridge to Bootham Park cycle route improvements crossing. Context and ‘before’ images links: #177760. Other image here today: #179818. Other images today: #179819.

The new bridge at Stockingfield Junction is taking shape.

Cycle Lane Closed, fend for yourself on York Way

Work in progress on the Stockingfield Bridge.

Road works by Cambridge Water at the Station Road/Hills Road junction - luckily many people are working from home. It would be nice to think that the dreadful potholes will be properly fixed, but I'm not optimistic.

[Image taken 29.11.21] Burton Stone Lane, junction with Field View, York. [Note: The works signs were removed 29.11.21] Signs for roadworks visible. They look as if some are obstructing the narrow pavement in a residential area, with a caf ... [more]

[Image taken 29.11.21] Burton Stone Lane, York. [Note: The works signs were removed 29.11.21] Just 78cm to pass this sign. This tall, thin person was happy to pose to illustrate how tight the space is... But also, being male, his widest ar ... [more]

[Image taken 29.11.21] Burton Stone Lane, York. [Note: The works signs were removed 29.11.21] Unattended kit. Could be vandalised, stolen or put to nefarious purpose. Other images here today: #176416. Other images today: #176415 and links.

[Image taken 29.11.21] Burton Stone Lane, junction with Ratcliffe Street, York. [Note: The works signs were removed 29.11.21] The pedestrian crossing was closed during the works. Burton Stone Lane has a 20mph limit but speeds are fast, pave ... [more]

[Image taken 29.11.21] Burton Stone Lane, York. [Note: The works signs were removed 29.11.21] A pavement width of 22cm? Context and links: #176416

[Image taken 29.11.21] Burton Stone Lane, York. [Note: The works signs were removed 29.11.21] This temporary sign is obstructing the already narrow pavement passing Mrs Greedy's cafe on a busy road. See also: #176418 and #176420. Context s ... [more]

The raised crossing at the junction of Old Dumbarton Road and Bunhouse Road is now in place. The tyre-grabbing incorrect tactile paving is still in place on the cycleway.

The Old Dumbarton Road cycleway is not finished, but it is open, and the COP26 diversion is now active.

The Old Dumbarton Road cycleway is not finished, but it is open, and the COP26 diversion is now active.

The present limit of the completed cycleway on Old Dumbarton Road at the rear of the Kelvin Hall. Work is ongoing to install the raised crossing at the Bunhouse Road junction.

The protracted roadworks to rebuild and extend the Old Dumbarton Road cycleway continue. The https://www.roadworksscotland.org/ website said the road closure to create the raised junction would have started by 7 October and Get Ready Glasgo ... [more]

The Old Dumbarton Road cycle track is far from complete, and the raised crossings further along still haven't been started. This is on the COP26 diversion route.

The Old Dumbarton Road cycle track is far from complete, and the raised crossings further along still haven't been started. This is on the COP26 diversion route.

The Old Dumbarton Road cycle track is far from complete, and the raised crossings further along still haven't been started. This is on the COP26 diversion route.

Site of a fatal collision between a lorry and a cyclist. See #174673.

Signs warning pedestrians to divert because of road works around the corner at this busy roundabout near Addenbrooke's Hospital.

Site of a fatal collision between a lorry and a cyclist. See #174665.

Slow progress on the North Canal Bank Street cycle track. The surface is now in on the cycle track side, but not the pedestrian side. The tactile paving is still the incorrect tyre-grabbing hazard type. This is the end of the cycle track.

Slow progress on the North Canal Bank Street cycle track. The surface is now in on the cycle track side, but not the pedestrian side. The tactile paving is still the incorrect tyre-grabbing hazard type.

Progress on the bridge under construction at Stockingfield Junction, looking through the worksite gate.

Road closed for building work - cycles can still get through

Roadworks in Caen, with temporary crossings in yellow.

Deviation for cyclists during roadworks - but in fact there's a route to the left as well.

Well-signed deviation for cyclists during roadworks

Temporary pedestrian and cycle crossing during roadworks.

Short cut-off closed for roadworks

New cycleways being put in on the Avenue de la République, presumably.

No idea why there are three bikes inside the roadworks outside Augsburg cathedral.

Roadworks - cycling is still allowed on the shared-use footway here.

Temporary end of shared-use path at roadworks - cyclists are directed down a decent enough ramp to the road.

Roadworks continue on Ferry Road. The surface on the footway is still incomplete. Updated at #175001 and #175002.

Still finishing work to be done on Old Dumbarton Road, and not looking likely to be finished in time for the COP26 diversion route coming this way. UPDATE: The raised crossing has now been installed. See #175266.

The shared footway on Bunhouse Road has been rebuilt, but has not had its dividing line reinstated. The zebra crossing has a random section of tactile paving nearby with no obvious purpose.

The toucan crossing across Argyle Street has been replaced by a pedestrian crossing and a separate cycle crossing. However, the approach is a bit cramped behind a bit of wall. See also #173170.

A new canal towpath access point has been created at the Centre81 community centre in Whitecrook. UPDATE: Now open.

A new steps and ramp access to the canal towpath is being built at the Centre81 community centre in Whitecrook. The towpath here has been resurfaced over a short distance.

[Update: Works completed. Sign removed.] [Image taken 20.7.21] Field View, York. Sign obscured until this point - but due to the narrow carriageway and pavement parking all road users need to be looking ahead. Other image this issue: #17233 ... [more]

[Update: Works completed. Sign removed.] [Image taken 20.7.21] Field View, York. Futile sign. Context image this issue: #172339. All images today: #172321 and links

New slip lanes taking shape at the Histon Road/Gilbert Road junction

New slip lanes taking shape at the Histon Road/Gilbert Road junction

The new bridge across the Black Cart Water is now in place, and awaiting completion of work.

The new bridge across the Black Cart Water is now in place, and awaiting completion of work.

A short diversion around some ongoing work, but the uneven surface and narrow width make it rather awkward to negotiate.

A short but awkward diversion around some ongoing work, see #170152.

The correct Cycleway tactile slabs have arrived in North Canal Bank Street and await fitting in place of the incorrect corduroy Hazard tactiles.

The contraflow cycle lane has been kept open through the roadworks - the awful speed humps on Bateman Street are finally being replaced.

The three collapsing speed humps at the eastern end of Bateman Street have been removed - with luck, something better might appear soon.

Building work continues at Clyde Place. The cycle track approaching the Tradeston Bridge has been rebuilt. However, the position of the temporary railing directed me onto the new kerb which I wasn't expecting.

The Chocolate Path (NCN route 33 and the Festival Way) and half of Cumberland Road closed for roadworks.

Temporary cycleway on Coldham’s Common, with little ramps to help corner cutters.

Temporary path during building work - there's a dropped kerb to the left, but cyclists are better off on the next path to the south.

Installation work on a protected cycle lane in Royston Road. Alterations appear to have been made.

Changes afoot on Bateman Street?

Temporary traffic lights on Mill Road bridge.

Shared path closed!

Cycle way closed approaching the Newmarket Road roundabout.

If you're cycling on the shared-use footway, there's a temporary ramp and diversion. If you're using the on-road cycle lane, you're a bit stuffed.

The path from Prospecthill Circus to Toryglen Road in Rutherglen is finally being rebuilt.

The path from Prospecthill Circus to Polmadie Road is being rebuilt.

A bus boarder under construction on the Brockburn Road pop-up cycle lane project.

The new Marsh Barton station is under construction here - 'Clapperbrook Lane East will close to vehicular traffic for 16 months from the end of May 2021, but will remain open to pedestrians and cyclists. The project includes a new pedestria ... [more]

Work outside Clydebank Town Hall. No sign yet of the cycle lanes shown in the artist's impression. https://www.scottishconstructionnow.com/article/4-3m-project-to-transform-clydebanks-town-centre-links

Pothole inspection on Grange Road - how long will it be before the hole gets fixed? And why can't this be done by a small electric vehicle?

Ditton Meadows ramp and bridge.

Histon Road

The Chief Engineer and colleague watch as the sixth box culvert (of fourteen) is lowered into place at Newmarket Road. This is a week long closure of the road to build the underpass for the Chisholm Trail.

Big hole in Newmarket Road. Good to see! @camcycle https://t.co/9QhDkemVhB

New arrangement of the Histon Road roadworks, with cars northbound only, to the right of the bollards, and cyclists to the left - but without a sign here.

New arrangement of the Histon Road roadworks, with cars northbound only, to the right of the bollards, and cyclists to the left.

There's a largely redundant dual-carriageway, but instead of taking a lane to provide the missing link cycleway between Swavesey and Fenstanton, they're spending much more time and money on a new alignment in the fields.

Work progressing on the new bridge across the Forth & Clyde Canal at Stockingfield Junction.

Markings for improvements (?) on both footways of Madingley Road (and temporary traffic lights)

North Canal Bank Street is closed for extensive rebuilding. Pedestrian access is maintained to the left (see #165586).

Chisholm Trail rollout 🤗

Histon Road is now closed southbound except for cyclists - this is the rather messy arrangement at the southern end.

Histon Road is now closed southbound - most (but not all) of the No Entry signs have Except Cycle signs in place.

Histon Road is now closed southbound, except for cycles (although there is actually access for construction vehicles to Darwin Green to the right) - unfortunately there's no dropped kerb to reach it.

The southern end of the Garscube Road cycle track still hasn't been completed, but is at least now rideable. Top surface is all that is required. Further north, the path is complete up until Sawmillfield Street, with work in progress at the ... [more]

London contractors seem to be quite good at this nowadays.

Redevelopment on Round Church Street nearing completion.

[Image taken 18.2.21] York: First of a blizzard of signs aimed at road users on Wigginton Road ahead of works at the junction with Crichton Avenue. The road is uphill, the carriageway in each direction is very narrow. It is used by large ve ... [more]

[Image taken 18.2.21] York, Wigginton Road. Too many signs. Messages get lost. The Do not overtake cyclists sign is still completely obscured at this point and therefore has no value. See also: #164311, #164310, #164313, #164314, #164315

[Image taken 18.2.21] York, Wigginton Road. Only at this point do road users have a chance of seeing the Do not overtake cyclists sign. But this location is too late to make a difference. Plus drivers have had so many signs with so many mes ... [more]

[Image taken 18.2.21] York, Wigginton Road. Again, the Do not overtake cyclists sign would seem to have limited use being placed among a line of other signs, and therefore obscured. See also: #164311, #164310, #164312, #164313, #164315

[Image taken 18.2.21] York, Wigginton Road. The Do not overtake cyclists sign is now visible but it is very close to the junction. This would seem to limit the chances of drivers seeing it and is too late on this section of Wigginton Road f ... [more]

Cycleway closed for utility works - coming in to Cambridge it's easy to see a route through the bus stop lay-by, but heading out people just go across the muddy grass.

Cycleway by new road from Northstowe towards the A14.

Road under construction for future phases of the Northstowe development.

Bridge under construction for the next phases of the Northstowe development

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photos/roadworks/event/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.