Donate using PayPal

Photo listing : roadworks (event)

The most recent photos are listed first. See also photomap view.

Histon Road is now closed southbound except for cyclists - this is the rather messy arrangement at the southern end.

Histon Road is now closed southbound - most (but not all) of the No Entry signs have Except Cycle signs in place.

Histon Road is now closed southbound, except for cycles (although there is actually access for construction vehicles to Darwin Green to the right) - unfortunately there's no dropped kerb to reach it.

The southern end of the Garscube Road cycle track still hasn't been completed, but is at least now rideable. Top surface is all that is required. Further north, the path is complete up until Sawmillfield Street, with work in progress at the ... [more]

London contractors seem to be quite good at this nowadays.

Redevelopment on Round Church Street nearing completion.

[Image taken 18.2.21] York: First of a blizzard of signs aimed at road users on Wigginton Road ahead of works at the junction with Crichton Avenue. The road is uphill, the carriageway in each direction is very narrow. It is used by large ve ... [more]

[Image taken 18.2.21] York, Wigginton Road. Too many signs. Messages get lost. The Do not overtake cyclists sign is still completely obscured at this point and therefore has no value. See also: #164311, #164310, #164313, #164314, #164315

[Image taken 18.2.21] York, Wigginton Road. Only at this point do road users have a chance of seeing the Do not overtake cyclists sign. But this location is too late to make a difference. Plus drivers have had so many signs with so many mes ... [more]

[Image taken 18.2.21] York, Wigginton Road. Again, the Do not overtake cyclists sign would seem to have limited use being placed among a line of other signs, and therefore obscured. See also: #164311, #164310, #164312, #164313, #164315

[Image taken 18.2.21] York, Wigginton Road. The Do not overtake cyclists sign is now visible but it is very close to the junction. This would seem to limit the chances of drivers seeing it and is too late on this section of Wigginton Road f ... [more]

Cycleway closed for utility works - coming in to Cambridge it's easy to see a route through the bus stop lay-by, but heading out people just go across the muddy grass.

Cycleway by new road from Northstowe towards the A14.

Road under construction for future phases of the Northstowe development.

Bridge under construction for the next phases of the Northstowe development

Roundabout and bridge (in the distance) under construction for future phases of Northstowe.

Traffic flow has been reversed through the Histon Road roadworks. This gap is how cyclists are meant to rejoin the road network.

Traffic calming being installed - it's fairly obvious, but when the signs say Road Closed, they don't include cyclists and pedestrians.

Raising the path by a few feet above the flood. Cambridge Road, Stapleford

Coldham’s Common ground examination work, marking the start of construction of the Chisholm Trail.

Preparing for the underpass of Newmarket Road near the Leper Chapel.

Coldham’s Common work has started on the Chisholm Trail.

Good to see that cycles are allowed contraflow on the lengthy works on Histon Road, but quite narrow cycle lane staring down motor traffic.

@MikeyCycling @RBKC @mragilligan @willnorman @theJeremyVine First wands removed in front of Dutch embassy tonight https://t.co/Q3sKEubE49

Link under construction to the new Chisholm Trail bridge to Chesterton and Cambridge North station.

Chisholm Trail construction site

The current state of the long-term roadworks on Histon Road - northbound traffic lane, southbound cycle lane

Abbey-Chesterton bridge craning into place. At this moment the engineers were waiting for the all-clear from Network Rail to confirm that the bridge could be moved into place as it is quite close to their bridge. I think power to the ove ... [more]

Abbey-Chesterton Bridge - airborne

'Cycleway Suspended' sign due to roadworks and temporary traffic lights - it looks well enough organised here, but there was a queue of cars all around the Waitrose car park where the lights were only letting a few cars out at a time.

Unloading crane parts

Crane parts delivered.

End of Cycleway sign at roadworks - dismount here

Finishing work still required at the southern end of the Garscube Road protected cycle lane. It will connecting into the underpass and other existing cycle infrastructure through Cowcaddens.

Progress on the Garscube Road cycle lane.

Cycle access preserved at these roadworks, Copenhagen

Slightly constrained temporary arrangement during work on the pedestrian side of the Inderhavnsbroen cycle bridge, Copenhagen

Slightly constrained temporary arrangement during work on the pedestrian side of the Inderhavnsbroen cycle bridge, Copenhagen

Tramway under construction, Odense

Tramway under construction in the centre of Odense

No Motor Vehicles signs, but a route for cyclists and pedestrians to the left - and an SUV driver who thinks he'll try it on (he had to turn back).

Roadworks on the southern access to the St.Pauli-Elbe Tunnel, Hamburg

Connection at Ditton Meadows under construction.

The new bridge to the Claypits nature reserve nearing completion.

The Garscube Road cycle track taking shape, at the Corn Street junction.

The connection from the underpass to the new cycle track on Garscube Road.

The Garscube Road cycle track starting to come together at its southern end.

Deviation for cycles and pedestrians (approximate location)

Cycleway closed - use the carriageway.

Temporary cycle lane during roadworks - no pedestrians allowed, in theory

One lane of carriageway closed to allow a cycleway deviation (of course).

Cycleways through a redevelopment zone, Amsterdam-Noord

Cycleway closed between Haarlem and Amsterdam - the on-road diversion wasn't too bad.

Diversion of cycleway, Leiden

Diverted cycleway near Leiden Centraal station

Diverted pedestrian/cycle route near Leiden Centraal station

The start of work on cycle lanes on Bilsland Drive. The lines go from here to Murano St/Shannon St so nothing much to see as yet. There were also some red paint marks at various points further east.

Construction work has started on a new bridge at Stockingfield canal junction, to remove the need to go down to Lochburn Road to cross the canal.

Yet more gas works :(

Claypits Nature Reserve bridge under construction over the Forth & Clyde Canal. There is a rough path to get around the side of the worksite.

Claypits Nature Reserve bridge under construction over the Forth & Clyde Canal.

New plaza being laid out in front to Doncaster station - I think I see a few cycle stands... but at the moment all cycle routes to the north are blocked.

On the plus side they haven't put a 'Cyclists Dismount' sign here, which is to be commended. On the downside, we have lots of signs on the pavement. We need a LTN/change in the law.

A temporary bus stop deployed while the Great Western Road cycle lane is built. This was the only temporary bus stop sign I saw in use.

A bus boarder under construction for the Great Western Road cycle lane. There is a temporary bus stop on the next corner.

Roadworks for the installation of the westbound cycle lane on Great Western Road.

Roadworks for the installation of the westbound cycle lane on Great Western Road.

Roadworks for the installation of the westbound cycle lane on Great Western Road.

Roadworks for the installation of the Great Western Road cycle lane. The crossing between Keal Avenue and Kearn Avenue is still no better for cycling across (see #100425).

Roadworks for the installation of the Great Western Road cycle lane. The marking for the start of the cycle lane appear to be unusually long. The marking for the cycle lane itself is another unusual choice.

Roadworks for the installation of the Great Western Road cycle lane. Here 'bus stop' markings have been removed, and the road marked out for the installation of a temporary bus boarder.

Roadworks for the installation of the Great Western Road cycle lane.

Roadworks for the installation of the Great Western Road cycle lane. There were a lot of cars parked inside the cones.

Start of the roadworks for the installation of the Great Western Road cycle lane.

Signage for the roadworks for the installation of the Great Western Road cycle lane, so no cycle lane on the sliproad then?

Construction at Cambridge University Library - the sign at the other end only refers to pedestrians, not cyclists.

Road Closed for sinkhole repairs - but of course (on Sunday morning) pedestrians and cyclists are actually passing freely.

Road Closed for sinkhole repairs - but of course (on Sunday morning) pedestrians and cyclists are actually passing freely.

Road Closed (sign blown over) - I'm not sure this is part of the Histon Road roadworks.

Work on the Coton path. Shouldn't close the path and clear through the West Cambridge site. It's sewer works. Great job for a hot day!

The works have started on the Mill Road bridge bus gate.

Progress on the Garscube Road protected cycle lane.

Construction of the Garscube Road protected cycle lane has recommenced.

Good that they mentioned the cycle lane!

Pedestrian and cycle channels at roadworks

Future link to Darwin Green?

The A1307 (by the new A14) is not yet open here - and they've stationed a bloke in a van to stop cyclists after one almost got squashed the other week.

More lockdown roadworks around the corner on Market Square - but cyclists going straight ahead are supposed to stop too.

Manchester. Trafford Green Lane in Sale. Road works to close road outside Petrol Station. Actually works quite well as a modal filter . Cycles and pedestrians can get through and cars can access Petrol .

Again! roadworks at the Mill Road/Gwydir St junction.

Just a brief interruption in fact, where the temporary traffic lights are placed. There are a lot of road works under way during the Covid-19 lockdown.

Gas works on Newnham Road during the Covid-19 lockdown - virtually no motor traffic to be held up.

Lots of roadworks going on during the Covid-19 lockdown.

Gas works on Newnham Road - the Covid-19 lockdown makes this a pretty stressfree time to block the road.

Cyclists Dismount at the Fendon Road roundabout roadworks

This section of the busway cycleway is still closed.

Building the mould to hold the Chesterton landing of the Chisholm Trail bridge.

Roadworks blocking the Kingston St contraflow route - lots of cyclists are getting past on the footway by the pub.

BREAKING NEWS: the CBC barrier is coming down! Thanks to John from @CTCCambridge for this picture and to the many people and organisations who have made this happen. Let's continue to work together to create a better, safer and accessible j ... [more]

Apart from wheelchair users, I can't see anyone much taking this lengthy diversion.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photos/roadworks/event/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.