Donate using PayPal

Photo listing : roadworks (infrastructure)

The most recent photos are listed first. See also photomap view.

Early work on the Chisholm Trail.

Cycle route under construction

Construction work, presumably for the riverside route R11 in Bratislava, under the Stary Most (Old Bridge), recently rebuilt for trams, cyclists and pedestrians only.

Having rebuilt the first half of the path to Chaucer Road, the contractors are now working on the other half.

The abandoned cycleway project seems to be growing a nice layer of grass. At least no-one is parking on this side now.

Road closed due to badger activity. It is still passable on foot or bicycle.

Uneven surface due to badger activity.

Exciting to spot Sauchiehall Street's new 'avenue' taking shape in Glasgow. 👀 🎉 🚶‍♀️🚲🌳🚌🚙 🚶‍♀️ Just couldn't help noticing the state of what appears to be the final cycle surface, in contrast to the ne ... [more]

Cycling through road works in the old town of Bukhara

Wide new footways going in on this route towards the station in Termez, Uzbekistan

New riverside environment being created in Gent

New riverside environment being created in Gent

New tramlines, Antwerp

Cycling home with Flora along Pollokshaws Road. Traffic management for the shared path resurfacing better cycle provision than path itself! Buy hey, 6 lanes for motors obviously essential https://t.co/Whhbubr5SC

Cycle route sign in roadworks, by Henry VIII's fortress, Tournai

Unfinished crossing for pedestrians and cyclists

Under construction - Rouen's 'metro'

There are a lot of construction markings on the eastern side at Happendon Services. Will the cycle route actually benefit from an upgraded facility or will there just be sliproads to cross?

Segregated cycleway under construction, I presume.

All this former farmland is being built on.

A new cycle route under construction on Dyke Road, leading to the BMX Centre at Knightswood Park. This was the last sign of work I saw heading down Dyke Road. Perhaps the footway will get widened. Update at #100297 and #101274.

A new cycle route under construction on Dyke Road, leading to the BMX Centre at Knightswood Park. I imagine this isn't finished.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. The entrance to the new BMX Centre, showing something close to a continuous footway across the entrance roadway.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. I think the cycleway is to be segregated from the road using orcas or similar.

A new cycle route under construction on Archerhill Road, leading to the BMX Centre at Knightswood Park. A staggered pedestrian crossing across the road (signalled) and cycleway (probably zebra). I think the cycleway is to be segregated w ... [more]

staggered pelican crossing of Longdon Road at King Street Lane junction Location: , Winnersh (England, United Kingdom)

Looking towards Hatch Farm Way (Winnersh Relief Road) from Longdon Road Location: , Winnersh (England, United Kingdom)

Longdon Road (Winnersh Relief Road) traffic lights, looking toward Hatch Farm Way Location: , Winnersh (England, United Kingdom)

Looking west towards Hatch Farm Way (Winnersh Relief Road) Location: , Winnersh (England, United Kingdom)

The entrance to Richmond Park now doubles as the construction site entrance. NCN756 is unuseable since there is no way through to the riverside other than the steps next to Rutherglen Bridge (see #95375).

Looking through the compound gate, a new road has been built through what was Richmond Park. I don't suppose that row of trees on the right is staying much longer.

Preliminary ground work for the Chisholm trail.

Remodelling at Walthamstow Queen's Road station

Remodelling the front of Walthamstow Central station - let's hope there'll be lots of cycle parking.

Remodelling the traffic-dominated centre of Walthamstow

Ramp under construction to the new bridge over the Basinsgtoke Canal - but I hope it's not just a link from the dual-carriageway, there needs to be an off-road route.

Slow progress on the parallel cycle/zebra crossing on Govan Road.

Construction of new two-way segregated cycleway, Pandora Ave, Victoria BC

Cycle parking and temporary signs at roadworks at Haymarket station

It'd be nice to think that a cycle route might be provided through the Rikhe Park - but I doubt it.

More Georgian roadworks - and the road above is just as bad. No signs, no diversions, no effort to get a move on.

It takes more than a bit of roadworks to stop Tbilisi drivers from parking.

It takes more than a bit of roadworks to stop Tbilisi drivers from parking.

Looking north away from station on proposed NCN422 Location: , Bracknell (England, United Kingdom)

New toucan crossing under construction near The Lexicon, Bracknell Location: , Bracknell (England, United Kingdom)

Northern carriageway of Millennium Way, looking east Is this a cycle path? Location: , Bracknell (England, United Kingdom)

Looking east along Millennium Way to new toucan crossing under construction from north side of Millennium Way to the Lexicon and Bracknell Library Location: , Bracknell (England, United Kingdom)

New service roads from Millennium Way to the Lexicon, Bracknell Location: , Bracknell (England, United Kingdom)

Path around the Ménec alignments, Carnac, closed for improvements.

Repairs above the towpath from Dinan to Léhon - now reopened after several years of closure due to rockfall

There's been some patching at the top of Grantchester St - I doubt if it'll last long.

Pemberton Terrace has had some patching-up - but nearby Coronation Street, which is in far worse shape, has not been touched.

Construction of cycle crossing to the Cambridge Biomedical Campus

Cycle Lane Closed for construction of decent cycle access to the Cambridge Biomedical Campus

Taking shape - the new cycleway past Cambridge Botanic Gardens on Trumpington Road.

Route signs and construction of off-road horse/cycle track for access to Canaston Woods, possibly paid for by the Bluestone Resort

New access to the Heartlands visitor attraction, Camborne

Roadworks on Trumpington Road - which I think are here to install a new cycleway.

Alley being pedestrianised, Georgetown, Penang

There might eventually be a short stretch of decent riverside cycleway here in Kuala Lumpur

There might eventually be a short stretch of decent riverside cycleway here in Kuala Lumpur

There might eventually be a short stretch of decent riverside cycleway here in Kuala Lumpur

There might eventually be a short stretch of decent riverside cycleway here in Kuala Lumpur

There might eventually be a short stretch of decent riverside cycleway here in Kuala Lumpur

New cycle path under construction to avoid double crossing of Water Lane

Cycle path under construction past the site of the Penny Ferry pub

Cycle path under construction past the site of the Penny Ferry pub

A section of the A77 cycleway being resurfaced and widened. Several bike tyre tracks can be seen.

Roadworks at road closure on the cycle/pedestrian route through Trient

Cycle route closed for construction, Luxembourg

New station access under construction, Luxembourg - presumably decent cycle parking will soon be provided.

Cycle route moved to the left around roadworks, Düsseldorf

Future route west from Mulheim station of RS1, Germany's first interurban cycle freeway.

Improvements on CS1 at Old Street

Improvements on CS1 at Old Street

Treluswell Hill (A39) being reduced from two lanes to one uphill as a 'safety improvement' - with any luck there'll be an uphill cycle lane instead.

Shared-use footway under construction near the Combined Universities in Cornwall campus.

New shared-use footway near the Combined Universities in Cornwall campus.

Does the red surfacing mean that this will become a cycle route?

Does the red surfacing mean that these will become cycle routes?

Construction of new cycleway along Oxford Road, Manchester

Construction of new cycleway along Oxford Road, Manchester

Construction of new cycle route along Oxford Road

Cyclists diverted around improvement works on the 4km circuit of Lucca's city walls

route of the NCN422 through the Lexicon Location: , Bracknell (England, United Kingdom)

zebra crossing south towards Bracknell High Street along the NCN422 route Location: , Bracknell (England, United Kingdom)

north along the zebra crossing along the NCN422 route away from the High Street Location: , Bracknell (England, United Kingdom)

Roadworks for the Cycle Superhighway along the Victoria Embankment

Roadworks for the Cycle Superhighway along the Victoria Embankment

Roadworks for the Cycle Superhighway along the Victoria Embankment

The east end of roadworks for the Cycle Superhighway along the Victoria Embankment

Much needed resurfacing of this cycleway (ten days during one week??)

Typical Romanian roadworks - they take forever and they make no provision for people to get past.

Another vaguely-Dutch style cycle track being built?

New-build residential blocks on the Surrey Street alignment.

Newly-built dead-end street, opposite #71048.

The centre of Rasnov is being dug up to provide storage space for cars.

Former route of the Ravenglass and Eskdale Railway - now being opened up as a walking and cycling route.

Scooter and roadworks, Patan, Kathmandu

Roadworks, Patan, Kathmandu

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/photos/roadworks/other/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.