Unnecessary reduction in cycle lane width from previous 1.5m with green tarmac to 1.0m with no intention to replace green tarmac. Adequate road width exists.
University Ave / Byres Rd junction - bad ASL completion with continuous line extending through the ASL box (which was not in the plans)
The centre of Scotland's cycle network - or should that be push-bike network? The surface is grippy.
Colleges Route, Clarence Drive - new build out added to provide some acrobatic excitement when heading home in the dark as you fly over it and into the parked cars.
Poor completion on flagship Connect 2 route by Kelvingrove Park, with cluttered shared route, stepped kerb and no protection for cyclists from traffic exiting from lane at right