Donate using PayPal

Andy Winter andywinter

Home

Latest photos

Unnecessary reduction in cycle lane width from previous 1.5m with green tarmac to 1.0m with no intention to replace green tarmac. Adequate road width exists.

University Ave / Byres Rd junction - bad ASL completion with continuous line extending through the ASL box (which was not in the plans)

The centre of Scotland's cycle network - or should that be push-bike network? The surface is grippy.

Temporary exit of NCN75 onto Pacific Drive. Cyclists who wish to turn right can't legally.

Colleges Route, Clarence Drive - new build out added to provide some acrobatic excitement when heading home in the dark as you fly over it and into the parked cars.

Poor completion on flagship Connect 2 route by Kelvingrove Park, with cluttered shared route, stepped kerb and no protection for cyclists from traffic exiting from lane at right

New Colleges 'cycle' route lane on Highburgh Rd blocked by cars as new parking bays are too narrow and road not wide enough for what was planned. Note no separation between cars and cyclists

New 'cycle' lane Highburgh Rd heading East. the white van is legally parked as close to the kerb as he can get. Straight after him is a side road exiting from the left.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/andywinter/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.