Donate using PayPal

baker

Home

Latest photos

Busway cyclepath, Cambridge Assessment frontage, central section. Fence protects rock cages supporting difference in levels of up to about 1.5m. This would need to be stabilised before the path could be widened about 1.5m to boundary fenc ... [more]

Busway cyclepath, Cambridge Assessment frontage, northern section. Verge and gravel infill by cyclepath - no problem to increase path width!

Busway cyclepath, Cambridge Assessment frontage, northern section. Fence protects rock cages as ground falls away from the path level (to a maximum of about 1.5m. Widening cyclepath at this point would require stabilisation of this wall.

Busway cyclepath, Cambridge Assessment frontage, southern section. About 1.5m space available to increase width of cycleway to boundary fence.

Busway cyclepath looking north from corner of Clare College sports ground and along University Press frontage. Plenty of room to widen cycleway.

Busway cyclepath by Clare College sports ground. Almost 1m from edge of path to fence. Could bee used to widen cyclepath if lighting pillars moved.

Busway cyclepath looking north at the corner of Clare College sports ground. A culvert inhibits easy widening of the cyclepath at this point.

Busway north of Long Road underpass. With moving of light pillars and cutting of hedge at least 1.5m could be added to width of busway path.

Cambridge Guided Busway and cycleway at Long Road

Busway cyclepath, Long Road underpass, looking south. Path should be re-aligned to improve sight lines through tunnel and junction with access from Long Road by moving away from busway track.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/baker/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.