Donate using PayPal

davidearl

Photos

Showing items 1 to 83 from total of 83 items. Ordered by location # descending.

Location # Icon Video Photo Caption Categorisation
73628Photo #73628Leaf Mould on The TinsCycleway:
Problem
cycleways
72501Photo #72501Extension of the Tins eastward to Orchard Estate nearing completionCycleway:
Infrastructure
cycleways
53634Photo #53634Another van that considers the cycle lane on East Road by the new fire station development is a loading lane. Driver refused to move.Obstruction:
Problem
obstructions
51000Photo #51000The wide part of The Tins path past David Lloyd gym.Other:
Misc
general
50999Photo #50999The start of the narrow section of The Tins path. A proposal at June 2013 would take a new cycleway from the gate at the right and to the right of the trees, running parallel to the existing path to the SWCycleway:
Infrastructure
cycleways
50998Photo #50998The western end of the currently narrow section of The Tins path where it meets and looking towards the the wide part. The proposal at June 2013 is to build a cycleway from this point to the left of the fence on the left parallel with the path running SW.Other:
Misc
general
50997Photo #50997Land to the south of the Tins path west of Orchard Estate, where a proposal at June 2013 is to put a cycleway parallel to the path where the bright coloured ground cover is in the foreground.Other:
Infrastructure
general
50996Photo #50996The barrier chicanes at Orchard Estate, looking towards town. A proposal at June 2013 is to install a new cycleway to the left of and parallel to the path opposite this photo. The first 10 metres alongside the brown fence is limited by the property, but after that there is wasteland to the south of the path.Obstruction:
Problem
obstructions
50995Photo #50995The barrier chicanes at Orchard Estate, looking towards town.Obstruction:
Problem
obstructions
50994Photo #50994The Tins path east of and looking towards Orchard Estate. Rather overgrown this time of year, but is normally wider.Cycleway:
Infrastructure
cycleways
50993Photo #50993The start of the Tins path at the Cherry Hinton end, off Railway StreetCycleway:
Infrastructure
cycleways
50992Photo #50992Sunmead walk looking west, with the school grounds on the right and the railway on the left. The chicane in the distance is the exit onto Cherry Hinton High Street by the level crossing. Not quite as wide as the central section.Cycleway:
Infrastructure
cycleways
50991Photo #50991Wider section of Sunmead Walk looking west.Cycleway:
Infrastructure
cycleways
50990Photo #50990Looking west along the path parallel to the railway between High St and bypass, Cherry Hinton. As the houses start, the path is much wider and properly surfaced.Road environment:
Problem
road
50989Photo #50989Shallow steps at the end of the path parallel to the railway just north of the level crossing on the Cherry Hinton bypassRoad environment:
Problem
road
50988Photo #50988Junction of Hinton Road with Fulbourn Old Drift. The car behind the sign is turning out of the Steiner School entrance beyond which on the right is the Ida Darwin Hospital for which planning permission is being souightRoad environment:
Infrastructure
road
50026Photo #50026Van blocks contraflow lane forcing cyclists into the opposite traffic, when not blocked completely by the queue for the lightsObstruction:
Problem
obstructions
38619Photo #38619New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38618Photo #38618New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38617Photo #38617New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38616Photo #38616New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38615Photo #38615New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38612Photo #38612Other:
Misc
general
38611Photo #38611New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38610Photo #38610New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38609Photo #38609New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38608Photo #38608New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38607Photo #38607New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38606Photo #38606New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38605Photo #38605New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38603Photo #38603New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38602Photo #38602New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38601Photo #38601New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
38600Photo #38600New arrangement at Pizza Hut now openCycleway:
Good practice
cycleways
37398Photo #37398Busway flooding May 1 2012 after heavy rainObstruction:
Problem
obstructions
34734Photo #34734Path between housing estate and Ely western bypass just ends.Cycleway:
Problem
cycleways
34139Photo #34139motorised ramp operated by access card (cycles can bypass), on entry to rear courtyard of Judge Institute (off Tennis Court Road)Enforcement:
Misc
enforcement
33510Photo #33510cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33509Photo #33509cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33508Photo #33508cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33507Photo #33507cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33506Photo #33506cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33505Photo #33505cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33504Photo #33504cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33503Photo #33503cycle bypass at station end of buswayRoad environment:
Infrastructure
road
33502Photo #33502New cycle bypass at station end of buswayRoad environment:
Infrastructure
road
32024Photo #32024Guidewheels on Guided BusOther:
Misc
general
29034Photo #29034Even though the bridge isn't right you can see what the new cycleway along the Tins will look like nowOther:
Misc
general
29033Photo #29033Even though it wasn't constructed properly, the lifting of the bridge gives a good impression of what the new cycleway will look like at The TinsOther:
Misc
general
29032Photo #29032Tins Bridge turns out to be too long - or more likely, the abutments weren't put in correctly. They'll have to take out some big chunks of reinforced concrete and re-lay them, then try again.

All fixed in #30171.
Other:
Misc
general
29030Photo #29030Tins bridge being lifted into place (4)Other:
Misc
general
29029Photo #29029Tins bridge being lifted into place (1)Other:
Misc
general
29028Photo #29028Tins bridge being swung into place (2)Other:
Misc
general
29027Photo #29027Oh how embarrassing. The new bridge over the Tins is lifted into place, only to find it is about 40cm too long.Cycleway:
Event
cycleways
27112Photo #27112Cycle parking, by the newsagent in Norfolk StreetCycle parking:
Infrastructure
cycleparking
27111Photo #27111Cycle parking at St Matthews ChurchCycle parking:
Good practice
cycleparking
25096Photo #25096Opening the new Reach Lode bridgeCycleway:
Good practice
cycleways
25095Photo #25095The new Reach Lode bridge on the Lodes Way, the new route for NCN11 opened on 12 September 2010.Cycleway:
Good practice
cycleways
25094Photo #25094The newly opened bridge at Reach Lode on the rerouted NCN11Cycleway:
Good practice
cycleways
25093Photo #25093Opening of Reach Lode Bridge on the new NCN11Other:
Event
general
25092Photo #25092At the start of White Fen on a ride to open the new bridge at Reach LodeDestination:
Event
destinations
21299Photo #21299NCN1 through an archway at the end of Exchange Square, Wisbech, signed as No Entry.General sign/notice:
Problem
signs
19817Photo #19817Cambridgeshire County Council does not permit the use of this sign. Erected by ... Cambridgeshire County CouncilGeneral sign/notice:
Infrastructure
signs
19816Photo #19816Cambridgeshire County Council does not permit the use of this sign. Erected by ... Cambridgeshire County CouncilGeneral sign/notice:
Infrastructure
signs
17789Photo #17789Taxi over-ranking in St Andrews Street is still a problemEnforcement:
Problem
enforcement
17788Photo #17788Taxi over-ranking in St Andrews Street is still a problemEnforcement:
Problem
enforcement
17787Photo #17787Taxi over-ranking in St Andrews Street is still a problemEnforcement:
Problem
enforcement
15900Photo #15900If Bury St Edmunds doesn't feel the need for an island, even when there is oodles of room for one, why does Cambridge?General sign/notice:
Good practice
signs
15899Photo #15899If Bury St Edmunds doesn't feel the need for an island, even when there is oodles of room for one, why does Cambridge?General sign/notice:
Good practice
signs
14427Photo #14427Incorrect No Motor Vehicles sign at the end of a dead-end residential streetGeneral sign/notice:
Problem
signs
14387Photo #14387No Motor Vehicles sign facing the wrong way in St Andrews Street, bringing the misunderstood sign into further disrepute.General sign/notice:
Problem
signs
13807Photo #13807Narrow shared use pavement between Babraham Road park & ride site and Worts CausewayCycleway:
Infrastructure
cycleways
13773Photo #13773New signs have gone up in St Andrews Street showing for the first time evidence that you can point someone to to say cyclists *are* allowed to cycle southbound.

The grey line is part of the sign painted out. I suspect it has a white line underneath which suggests they may be about to mark out a contraflow lane when the footway is finished, though the Cycling Campaign hasn't been consulted about this.
General sign/notice:
Good practice
signs
13772Photo #13772Traffic avoiding the right turn ban by doing a U turn around the island is apparently now endemic.Enforcement:
Problem
enforcement
13771Photo #13771Road works on Hills Road Bridge.Obstruction:
Problem
obstructions
13693Photo #13693Riverside Bridge motion testing event, prior to bridge openingOther:
Event
general
13692Photo #13692Riverside Bridge motion testing event, prior to bridge openingOther:
Event
general
13691Photo #13691Riverside Bridge motion testing event, prior to bridge openingCycleway:
Event
cycleways
13690Photo #13690Riverside Bridge motion testing event, prior to bridge openingOther:
Event
general
12419Photo #12419Mowbray Road - very narrow cycle lanesCycleway:
Problem
cycleways
9135Photo #9135Gonville Place crossing in May 2002, before the island was removed and the forest of poles addedOther:
Infrastructure
general
9134Photo #9134Gonville Place crossing in May 2002, before the island was removed and the forest of poles addedOther:
Infrastructure
general
8824Photo #8824Sheeps Green Bridge reconstructionCycleway:
Misc
cycleways

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/davidearl/photos/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.