Showing items 1 to 82 from total of 82 items. Ordered by location # descending.
Location # ![]() |
Video | Photo | Caption | Categorisation |
---|---|---|---|---|
73628 | ![]() | Leaf Mould on The Tins | Cycleway: Problem cycleways | |
53634 | ![]() | Another van that considers the cycle lane on East Road by the new fire station development is a loading lane. Driver refused to move. | Obstruction: Problem obstructions | |
51000 | ![]() | The wide part of The Tins path past David Lloyd gym. | Other: Misc general | |
50999 | ![]() | The start of the narrow section of The Tins path. A proposal at June 2013 would take a new cycleway from the gate at the right and to the right of the trees, running parallel to the existing path to the SW | Cycleway: Infrastructure cycleways | |
50998 | ![]() | The western end of the currently narrow section of The Tins path where it meets and looking towards the the wide part. The proposal at June 2013 is to build a cycleway from this point to the left of the fence on the left parallel with the path running SW. | Other: Misc general | |
50997 | ![]() | Land to the south of the Tins path west of Orchard Estate, where a proposal at June 2013 is to put a cycleway parallel to the path where the bright coloured ground cover is in the foreground. | Other: Infrastructure general | |
50996 | ![]() | The barrier chicanes at Orchard Estate, looking towards town. A proposal at June 2013 is to install a new cycleway to the left of and parallel to the path opposite this photo. The first 10 metres alongside the brown fence is limited by the property, but after that there is wasteland to the south of the path. | Obstruction: Problem obstructions | |
50995 | ![]() | The barrier chicanes at Orchard Estate, looking towards town. | Obstruction: Problem obstructions | |
50994 | ![]() | The Tins path east of and looking towards Orchard Estate. Rather overgrown this time of year, but is normally wider. | Cycleway: Infrastructure cycleways | |
50993 | ![]() | The start of the Tins path at the Cherry Hinton end, off Railway Street | Cycleway: Infrastructure cycleways | |
50992 | ![]() | Sunmead walk looking west, with the school grounds on the right and the railway on the left. The chicane in the distance is the exit onto Cherry Hinton High Street by the level crossing. Not quite as wide as the central section. | Cycleway: Infrastructure cycleways | |
50991 | ![]() | Wider section of Sunmead Walk looking west. | Cycleway: Infrastructure cycleways | |
50990 | ![]() | Looking west along the path parallel to the railway between High St and bypass, Cherry Hinton. As the houses start, the path is much wider and properly surfaced. | Road environment: Problem road | |
50989 | ![]() | Shallow steps at the end of the path parallel to the railway just north of the level crossing on the Cherry Hinton bypass | Road environment: Problem road | |
50988 | ![]() | Junction of Hinton Road with Fulbourn Old Drift. The car behind the sign is turning out of the Steiner School entrance beyond which on the right is the Ida Darwin Hospital for which planning permission is being souight | Road environment: Infrastructure road | |
50026 | ![]() | Van blocks contraflow lane forcing cyclists into the opposite traffic, when not blocked completely by the queue for the lights | Obstruction: Problem obstructions | |
38619 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38618 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38617 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38616 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38615 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38612 | ![]() | Crossing | Other: Misc general | |
38611 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38610 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38609 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38608 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38607 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38606 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38605 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38603 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38602 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38601 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
38600 | ![]() | New arrangement at Pizza Hut now open | Cycleway: Good practice cycleways | |
37398 | ![]() | Busway flooding May 1 2012 after heavy rain | Obstruction: Problem obstructions | |
34734 | ![]() | Path between housing estate and Ely western bypass just ends. | Cycleway: Problem cycleways | |
34139 | ![]() | motorised ramp operated by access card (cycles can bypass), on entry to rear courtyard of Judge Institute (off Tennis Court Road) | Enforcement: Misc enforcement | |
33510 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33509 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33508 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33507 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33506 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33505 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33504 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33503 | ![]() | cycle bypass at station end of busway | Road environment: Infrastructure road | |
33502 | ![]() | New cycle bypass at station end of busway | Road environment: Infrastructure road | |
32024 | ![]() | Guidewheels on Guided Bus | Other: Misc general | |
29034 | ![]() | Even though the bridge isn't right you can see what the new cycleway along the Tins will look like now | Other: Misc general | |
29033 | ![]() | Even though it wasn't constructed properly, the lifting of the bridge gives a good impression of what the new cycleway will look like at The Tins | Other: Misc general | |
29032 | ![]() | Tins Bridge turns out to be too long - or more likely, the abutments weren't put in correctly. They'll have to take out some big chunks of reinforced concrete and re-lay them, then try again. All fixed in #30171. | Other: Misc general | |
29030 | ![]() | Tins bridge being lifted into place (4) | Other: Misc general | |
29029 | ![]() | Tins bridge being lifted into place (1) | Other: Misc general | |
29028 | ![]() | Tins bridge being swung into place (2) | Other: Misc general | |
29027 | ![]() | Oh how embarrassing. The new bridge over the Tins is lifted into place, only to find it is about 40cm too long. | Cycleway: Event cycleways | |
27112 | ![]() | Cycle parking, by the newsagent in Norfolk Street | Cycle parking: Infrastructure cycleparking | |
27111 | ![]() | Cycle parking at St Matthews Church | Cycle parking: Good practice cycleparking | |
25096 | ![]() | Opening the new Reach Lode bridge | Cycleway: Good practice cycleways | |
25095 | ![]() | The new Reach Lode bridge on the Lodes Way, the new route for NCN11 opened on 12 September 2010. | Cycleway: Good practice cycleways | |
25094 | ![]() | The newly opened bridge at Reach Lode on the rerouted NCN11 | Cycleway: Good practice cycleways | |
25093 | ![]() | Opening of Reach Lode Bridge on the new NCN11 | Other: Event general | |
25092 | ![]() | At the start of White Fen on a ride to open the new bridge at Reach Lode | Destination: Event destinations | |
21299 | ![]() | NCN1 through an archway at the end of Exchange Square, Wisbech, signed as No Entry. | General sign/notice: Problem signs | |
19817 | ![]() | Cambridgeshire County Council does not permit the use of this sign. Erected by ... Cambridgeshire County Council | General sign/notice: Infrastructure signs | |
19816 | ![]() | Cambridgeshire County Council does not permit the use of this sign. Erected by ... Cambridgeshire County Council | General sign/notice: Infrastructure signs | |
17789 | ![]() | Taxi over-ranking in St Andrews Street is still a problem | Enforcement: Problem enforcement | |
17788 | ![]() | Taxi over-ranking in St Andrews Street is still a problem | Enforcement: Problem enforcement | |
17787 | ![]() | Taxi over-ranking in St Andrews Street is still a problem | Enforcement: Problem enforcement | |
15900 | ![]() | If Bury St Edmunds doesn't feel the need for an island, even when there is oodles of room for one, why does Cambridge? | General sign/notice: Good practice signs | |
15899 | ![]() | If Bury St Edmunds doesn't feel the need for an island, even when there is oodles of room for one, why does Cambridge? | General sign/notice: Good practice signs | |
14427 | ![]() | Incorrect No Motor Vehicles sign at the end of a dead-end residential street | General sign/notice: Problem signs | |
14387 | ![]() | No Motor Vehicles sign facing the wrong way in St Andrews Street, bringing the misunderstood sign into further disrepute. | General sign/notice: Problem signs | |
13807 | ![]() | Narrow shared use pavement between Babraham Road park & ride site and Worts Causeway | Cycleway: Infrastructure cycleways | |
13773 | ![]() | New signs have gone up in St Andrews Street showing for the first time evidence that you can point someone to to say cyclists *are* allowed to cycle southbound. The grey line is part of the sign painted out. I suspect it has a white line underneath which suggests they may be about to mark out a contraflow lane when the footway is finished, though the Cycling Campaign hasn't been consulted about this. | General sign/notice: Good practice signs | |
13772 | ![]() | Traffic avoiding the right turn ban by doing a U turn around the island is apparently now endemic. | Enforcement: Problem enforcement | |
13771 | ![]() | Road works on Hills Road Bridge. | Obstruction: Problem obstructions | |
13693 | ![]() | Riverside Bridge motion testing event, prior to bridge opening | Other: Event general | |
13692 | ![]() | Riverside Bridge motion testing event, prior to bridge opening | Other: Event general | |
13691 | ![]() | Riverside Bridge motion testing event, prior to bridge opening | Cycleway: Event cycleways | |
13690 | ![]() | Riverside Bridge motion testing event, prior to bridge opening | Other: Event general | |
12419 | ![]() | Mowbray Road - very narrow cycle lanes | Cycleway: Problem cycleways | |
9135 | ![]() | Gonville Place crossing in May 2002, before the island was removed and the forest of poles added | Other: Infrastructure general | |
9134 | ![]() | Gonville Place crossing in May 2002, before the island was removed and the forest of poles added | Other: Infrastructure general | |
8824 | ![]() | Sheeps Green Bridge reconstruction | Cycleway: Misc cycleways |