Donate using PayPal

Eleanor Blair eleanorb

Photos

Showing items 1 to 12 from total of 12 items. Ordered by location # descending.

Location # Icon Video Photo Caption Categorisation
20084Photo #20084Unpassable underpassObstruction:
Event
obstructions
11183Photo #11183Sign on gate directing cyclists onto pavementRoute sign:
Event
routesigns
11182Photo #11182Road closed to build Riverside bridge. Pedestrians and cycles directed onto pavement. Cycle sign slight obscured due to gate being open.Route sign:
Event
routesigns
11181Photo #11181The road has been raised to the same level as the pavement, to enable cyclists and pedestrians to pass each otherCycleway:
Event
cycleways
11180Photo #11180Pedestrians and cyclists are directed onto the pavement due to road closure for cycle bridge workRoute sign:
Event
routesigns
11179Photo #11179Road Closed for cycle bridge worksGeneral sign/notice:
Event
signs
11178Photo #11178You can just about make out both the National Cycle Network signs on the right and the Road Closed Ahead sign on the leftGeneral sign/notice:
Event
signs
10646Photo #10646Lensfield Road: Contractors have accidentally installed the panel for a Toucan crossing, despite the fact both pavements are for pedestrians onlyGeneral sign/notice:
Problem
signs
8865Photo #8865Cyclists asked to dismount to cross a side road on NCN 51.General sign/notice:
Misc
signs
8764Photo #8764Ely CathedralDestination:
Misc
destinations
8762Photo #8762Cambridge University Engineering DepartmentDestination:
Misc
destinations
8761Photo #8761Eleanor after London to Cambridge bike ride 2001Bicycle:
Misc
bicycles

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/eleanorb/photos/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.