Donate using PayPal

Jan gonja

Photos

Showing items 1 to 25 from total of 25 items. Ordered by location # descending.

Location # Icon Video Photo Caption Categorisation
88831Photo #88831Footpath going east from Kenilworth GreenwayTrack:
Infrastructure
track
88830Photo #88830Kissing gate to footpath north of Kenilworth Greenway (there are four before reaching the main road)Obstruction:
Infrastructure
obstructions
88829Photo #88829Western end of the Kenilworth GreenwayRoute sign:
Infrastructure
routesigns
75935Photo #75935Convenient bridgeCycleway:
Good practice
cycleways
71098Photo #71098Disused railway station converted to cupcake shop? Great idea!Destination:
Infrastructure
destinations
71097Photo #71097Disused Staffordshire and Wolverhampton Rail Line is now a really pleasant cycle and footpath, photo taken between Lower Penn and WombourneTrack:
Infrastructure
track
67236Photo #67236Foot and cycle path behind houses. Not ideal.Track:
Infrastructure
track
67235Photo #67235Ducklings, mother duck and geeseOther:
Misc
general
67234Photo #67234River boat rallyOther:
Event
general
67233Photo #67233Canal and track under M5Track:
Misc
track
67215Photo #67215Two steps missingCycleway:
Problem
cycleways
67213Photo #67213Danger: edge of bricks gave me two punctures!Cycleway:
Problem
cycleways
61280Photo #61280Main path (NCN 5) through Canon Hill Park towards sunset.Track:
Misc
track
60877Photo #60877The canal towpath along this stretch isn't really suited to a hybrid bike, as it is quite muddy and bumpy.Track:
Infrastructure
track
60759Photo #60759"Cycling prohibited" sign *on* a cycle path... can anyone explain?!General sign/notice:
Problem
signs
60062Photo #60062Canal towpath beneath Smethick Galton BridgeTrack:
Infrastructure
track
59603Photo #59603Toll End Works Junction: lack of blue NCN signage. You need to cross the bridge over the main canal to change from the left to the right bank. This applies in both directions. The black and white Canal & River Trust signs (left edge of photo) luckily show the NCN81.General sign/notice:
Problem
signs
59602Photo #59602Bromford JunctionGeneral sign/notice:
Infrastructure
signs
59425Photo #59425Newly surfaced towpath between Mary Vale Rd and Pershore Rd, as part of Birmingham Cycle Revolution.Cycleway:
Infrastructure
cycleways
59184Photo #59184Plane watching locationDestination:
Misc
destinations
59182Photo #59182Extremely muddy section after some heavy rain.Cycle parking:
Problem
cycleparking
59078Photo #59078Pointless signage.Cycle parking:
Problem
cycleparking
59077Photo #59077Narrow, unpleasant looking footpath. Turning back.Track:
Problem
track
59076Photo #59076Narrow, unpleasant looking footpath. Turning back.Cycle parking:
Infrastructure
cycleparking
58666Photo #58666Signs need cleaningRoute sign:
Problem
routesigns

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/gonja/photos/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.