Donate using PayPal

kenwarner

Home

Latest photos

Work in several areas of the south underpass compound is concentrated on drainage

Excavating for Trail foundations at north approach to underpass

Survey work in progress on Trail river bridge north ramp

White lines etc done, but still some work to do on a now-smaller patch including the central island

Not clear why the cycle lane is still obstructed by one bollard/barrier pair.

The section of bridge ramp that for so long looked unfinished appears to be the site of feature 'green wall' planting

There's enough water in the supposedly dry brook to need pumping out for work to proceed

Between the fences, area that was compound now (in theory) recovering common. Beyond the second fence, Trail alignment and realigned brook.

Impossible to be sure, but could be preparation for surfacing at this Trail junction

Foreshortened by telephoto lens, but giving an idea of the generous width of the bridge. Something (handrail?) was in progress.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/kenwarner/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.